We need to continually operate, maintain and develop New Zealand’s transmission network – the National Grid – to ensure we meet the ongoing electricity needs of New Zealanders.
We are replacing the conductor on the Bunnythorpe to Haywards A and B lines with a slightly larger conductor which will help meet the future electricity needs of New Zealand. These lines start from Haywards, passing by communities at Paraparaumu, Waikanae, Otaki, Waitarere and Foxton on their way to Bunnythorpe.