News from Transpower - March 2024

07 Mar 2024

Transpower banner

In the March edition of News from Transpower we highlight:
 

  • Input invited on the future role of the HVDC link 
     
  • Transpower seeks non-transmission solultions for upper South Island 
     
  • Standard Transpower conceptual designs for new greenfield connections
     
  • New batterry energy storage system (BESS) setback guildline 
     
  • Annual industry simulation exercise in May 
     
  • Stimulation exercise to restore grid following island-wide black-out 
     
  • Transpower releases half-year results 
     
  • Consultation on changes to the System Operator Rolling Outage Plan (SOROP) 
  • February customer webinar 
     
  • Annual outage plan 2024/25
     

Read more here
 

Subscribe to future editions straight your inbox here

⟵ ALL NEWS