Consultation
From August to October 2021, Transpower sought feedback on a wide range of options for future grid investments to meet the needs of a decarbonised future.
The NZGP1 Longlist consultation document focused on the part of the grid backbone between the High Voltage Direct Current (HVDC) link between the North and South Islands, the transmission lines in the central North Island, and the lines around the Wairakei area.
Transpower was particularly interested to know whether our picture of the future and scenario assumptions were reasonable, and whether there is anything missing from the longlist or further criteria for decision-making.
Consultation closed on 1 October 2021. Thank you to all who submitted.
Submissions received
Thank you to those who provided submissions during the NZGP1 Long-list consultation from August to October 2021.
Mercury submission on NZGP1 Long-list October 2021
Meridian submission on NZGP1 Long-list October 2021
NZ Geothermal Association submission on NZGP1 Long-list October 2021
Smart Wires submission on NZGP1 Long-list October 2021
Takehe 8C submission on NZGP1 Long-list October 2021
Unison submission on NZGP1 Long-list October 2021
Vector submission on NZGP1 Long-list October 2021