Resources
Displaying 1 - 1 of 1
Last updated: 10 Apr 2024
Guidance for developers establishing Solar Farms and BESS (Battery Energy Storage System) near Transpower Assets (V2)
… provided in the National Policy Statement on Electricity Transmission 2008 (NPSET); and • comply with the mandatory … panels) are not located within 12 metres each side of the transmission lines (National Grid Yard - NGY) or compromise … their own cost. Any EPR mitigation recommended in the final report should be considered in the design and construction …