Resources
Displaying 1 - 2 of 2
Last updated: 11 Feb 2025
Redclyffe 220 kV Switchyard Resilience - Shortlist Consultation
… will also enhance the capabilities of the national transmission grid in this region. The costs associated with … 16. The cost to consumers of this unserved energy was reported by the System Operator to be in the range $232 - … need for resiliency to be front of mind in asset management planning and investment strategies. Good electricity …
Last updated: 11 Feb 2025
Redclyffe 220 kV Switchyard Resilience - Attachment 1 - Options analysis
… both the initial recovery and rebuild of Redclyffe, planning work between Transpower and Unison Networks and … Increased? Flood Resilience Option 1 Repair Do Minimal Transmission Redclyffe Complete already • Redclyffe repaired … quality and was determined in our commissioned work design report. The range of cost uncertainty is tested in the …