New Connections General FAQ
… connections funded? Funding of connections is split between Transmission Pricing Methodology (TMPM) charges and … well in advance. This should also be considered in your planning. Our Transmission Planning Report includes an overview of Transpower's Enhancement and …
Conenctions frequently asked questions
(PDF 176.24 KB)
Last updated: 03 Mar 2023
Application Form Guidance Notes
… to progress an application to investigate connection to the transmission grid, as per the Connections Management … be made by the party proposing to connect to Transpower’s transmission network: this will either be the developer of a … a generation project. The applicant will need to submit a report detailing the conceptual design of generation and the …
GuidanceNotestoApplication Form_V2_Final.pdf
(PDF 607.81 KB)
Last updated: 31 Jan 2025
Generation Connection Guide.pdf
… 8 WORKSTREAM A: TRANSMISSION CONNECTION AND CHARGES … 20 Phase B3. Planning … Electricity Industry Participation Code 20101 FTR Financial Transmission Rights GIP Grid Injection Point Grid The system … Control And Data Acquisition system SSR Solution Study Report SOW Statement Of Work System Operator Transpower …
Generation Connection Guide V12
(PDF 864.82 KB)
Last updated: 26 Feb 2025
February customer webinar slides 2025
… Manager, Grid Delivery 13:45 – 14:00 New disclosure reporting obligations required of Transpower by the … others) • Enabled early start of some activities such as transmission lines environmental assessments • Added … as well as the cost of generation developments on the transmission and distribution networks.” …
February customer webinar slides 2025.pdf
(PDF 2.98 MB)
Last updated: 21 Jan 2025
Northland-Doc-Dec 24
… Transpower transmits electricity over 12,000 kilometres of transmission lines and through 170 substations around New … Review of physical and transitional risk in sustainability reporting Top Energy’s sustainability reporting has been … initiatives so far will inform aspects of our resilience planning for the Northland region. These efforts are part of …
Northland-Doc-Dec 24.pdf
(PDF 9.21 MB)
Last updated: 21 Jan 2025
Resilience Reliability and an Energy Bridge Te Tai Tokerau Northland
… Transpower transmits electricity over 12,000 kilometres of transmission lines and through 170 substations around New … Review of physical and transitional risk in sustainability reporting Top Energy’s sustainability reporting has been … initiatives so far will inform aspects of our resilience planning for the Northland region. These efforts are part of …
Last updated: 03 Mar 2023
Connection Application Form
… to progress an application to investigate connection to the transmission grid, as per the Connections Management … Conceptual design Has the applicant included a report of preliminary design of the project, including … the applicant included a report considering connection and transmission capacity for the proposed connection (for …
Connection Application Form
(DOCX 957.1 KB)
Last updated: 31 Jan 2025
Transpower Grid Exit Point (GXP) impact studies for Distributed Energy Resource (DER) development.pdf
… their Power Factor, or any other requirement, under its Transmission Agreement with Transpower (including schedule 8 … shared with Transpower’s Operational Engineering and System Planning teams who will review the study reports and confirm any changes required to Transpower …
Last updated: 07 Aug 2023
Typical property requirements and timeframes for a new GIP substation (August 2023)
… requirements will be determined during the grid connection planning and design processes. Sample/Generic Property … to the new Transpower switchyard; o any new or modified transmission lines or cables; o the addition of earth-peaks … it was sent, unless the sender has received an automated report indicating non-delivery by that time, provided that …
Last updated: 03 Nov 2022
Connection Management Framework Decision Paper
… wishing to connect new generation and energy storage to the transmission network. 10. The Framework applies to all … information on grid constraints via the Transmission Planning Report, Envision tool, workshops, and Concept Assessments. …
Connection Management Framework Decision Paper
(PDF 1.57 MB)