Last updated: 05 Jul 2023
PR-OC-214 Publish a Planned Outage Co-ordination Procedure (POCP) Assessment.pdf
… 10 5.4.2 HVDC outages – Planning … been approved for publishing? Publish the assessment report to POCP 3 Yes Continue to monitor the situation after … effect of this constraint is to manage flows through all transmission lines into the upper North Island region for a …
Last updated: 30 Jan 2025
GL-EA-953 Connection Study Requirements for Connecting a New Generating Station.pdf
… 15 5.7. Connection studies report format … a fixed voltage magnitude and angled through an equivalent transmission network impedance. SSF System Security Forecast … be clearly identified in a study scope document during the Planning phase of commissioning, as reflected in the …
Last updated: 31 Jan 2025
Generation Connection Guide.pdf
… 8 WORKSTREAM A: TRANSMISSION CONNECTION AND CHARGES … 20 Phase B3. Planning … Electricity Industry Participation Code 20101 FTR Financial Transmission Rights GIP Grid Injection Point Grid The system … Control And Data Acquisition system SSR Solution Study Report SOW Statement Of Work System Operator Transpower …
Generation Connection Guide V12
(PDF 864.82 KB)
Last updated: 15 May 2023
GL-EA-765 Grid Asset Test Requirements.pdf
… 20 12 Transmission Line Parameter Tests … 34 Sample Report Headings … industry/asset-owner-requirements/asset-test-planning. 3.1.4 Submission of information When reviewing the … IEEE Guide for the Functional Specification of Transmission Static Synchronous Compensator (STATCOM) …
GL-EA-765 Grid Asset Test Requirements.pdf
(PDF 1.07 MB)
Last updated: 31 Jan 2025
Transpower Grid Exit Point (GXP) impact studies for Distributed Energy Resource (DER) development.pdf
… their Power Factor, or any other requirement, under its Transmission Agreement with Transpower (including schedule 8 … shared with Transpower’s Operational Engineering and System Planning teams who will review the study reports and confirm any changes required to Transpower …
Last updated: 22 Nov 2023
GL-OC-932 Security of Supply Outage Watchlist.pdf
… 3 2.1 Upper North Island Transmission Outages … Security of Supply Event CIMS Playbook ▪ SP-OC-759 Outage Planning Policy https://www.ea.govt.nz/search/?query=part+9 … Watchlist are required to be identified in IONS to allow reporting on upcoming watchlist outages through IONS. These …
GL-OC-932 Security of Supply Outage Watchlist.pdf
(PDF 250.81 KB)
Last updated: 08 Apr 2025
UG-OC-841 NZGB - Application and Calculation User Guide.pdf
… of output. Position Date Prepared By: Alex Shin Operations Planning Engineer 08/04/25 Reviewed By: Minura Vithanage … 32 10.3.3 Transmission Outages … ▪ View N-1-G balance ▪ View documents, including monthly reports and any assessments ▪ Adjust timeframes to view …
Last updated: 17 May 2023
GL-EA-789 Interim Requirements for Connection of New Generation Technology.pdf
… system Inverter-connected assets may be connected to either Transmission or Distribution assets. Transmission-connected … of the asset to the System Operator in order to complete planning studies. The System Operator Power Plant Dynamic … grid owner with a copy of the metering installation design report. Refer: Code clauses 13.136 – 13.140 for embedded …
Last updated: 21 Mar 2025
GL-EA-404 Generation Commissioning Process
… 10 3. Planning … flow of electricity across Transpower’s high-voltage transmission network. We are responsible for ensuring … you will provide modelling files and a connection studies report. ▪ Validated power system models: the System Operator … to prepare two important datasets as part of a data transmission contract. These are: ▪ a set of indications and …
GL-EA-404 Generation Commissioning Process.pdf
(PDF 1.31 MB)
Last updated: 17 Oct 2022
UG-SD-989 POCP User Guide.pdf
… o Generation - Equipment owned or operated by Generators o Transmission - Equipment owned or operated by Transmission … (optional), this is for grouping outage blocks together. Planning Status • Status of the outage, whether its … latest issue. © 2022 Transpower New Zealand Limited • Error reporting and warnings will be different - the same errors …
UG-SD-989 POCP User Guide.pdf