Resources
Displaying 1 - 5 of 5
Last updated: 02 Sep 2022
2021 Asset Management Plan
… 222 4.4. Transmission Lines … (ITP). The other supporting documents are the Transmission Planning Report (TPR) and the Grid Outputs Report. The purpose of the …

Last updated: 23 Mar 2023
2023 Annual Outage Planning Forum.pdf
… Annual Outage Planning Forum 23/24 22 March 2023 Introduction ANNUAL … Bog Roy Fighting Bay Te Hikowhenua Oteranga Bay Please note Transmission Lines are excluded from this strategy The … plan • Outage planning policy • Outage forum slides • Reporting - planned loss of supply and n-security outage …
2023 Annual Outage Planning Forum.pdf
(PDF 6.54 MB)
Last updated: 20 Sep 2022
Submission Summary - Grid Service Engagement Paper
… 1. Planned outage performance to ensure efficient outage planning is achieved and 2. New grid connections to ensure … of future load forecasts. GP-M – Momentary Interruptions Reporting 10. Do you use the information reported on in the … (c) Given the uncertainties created by the shift to the new Transmission Pricing Methodology we recommend that …
RCP4 Submission Summary - Grid Service Engagement Paper
(PDF 585.99 KB)

Last updated: 25 Sep 2024
Schedule - BS.pdf
… output from the Unit that supports the initial charging of transmission circuits and other Assets, and the progressive … Agent must: (a) Inform the System Operator: immediately report the unexpected outage to the System Operator, including reporting to the System Operator the expected time to …
Schedule - BS.pdf
(PDF 338.81 KB)
Last updated: 28 Nov 2024
SPD_Model_Formulation_v14.0_mh5
… ALL RIGHTS RESERVED The information contained in the report is protected by copyright vested in Transpower New Zealand Limited (“Transpower”). The report is supplied in confidence to you solely for your … 10 3.5 HVDC Transmission System … 12 3.6 AC Transmission System …
SPD_Model_Formulation_v14.0_mh5.pdf
(PDF 2.36 MB)