Resources
Displaying 11 - 20 of 30
Last updated: 28 Jan 2025
Market Operations - Weekly Report - 26 January 2025
… Power BI Desktop Market Operations Weekly Report - Week Ended 26 January 2025 TRANSPOWER // MARKET … storage, increasing demand and some central North Island transmission outages. Hydro generation contributed 55%, wind … GWh was sent north and 3 GWh was sent south. Transpower is planning an outage on the HVDC link on 8 February ahead of …
Market Operations - Weekly Report - 26 January 2025.pdf
(PDF 2.56 MB)
Last updated: 27 Jun 2023
Transpowe submission on 2023 Draft advice to inform the second ERP
… to the Commission that highlights the: - Criticality of transmission infrastructure and system operations to support … p.111 3 March 2023 Whakamana i Te Mauri Hiko Monitoring Report, p.4 … strengthened documents should be included in the National Planning Framework (NPF) under the Natural and Built …
20230620 - Transpower submission on ERP2 draft advice .pdf
(PDF 339.62 KB)
Last updated: 21 Jan 2025
Market Operations - Weekly Report - 19 January 2025
… Power BI Desktop Market Operations Weekly Report - Week Ended 19 January 2025 TRANSPOWER // MARKET … more closely through the market schedules. The latest NZGB report is available on the NZGB website. Electricity Market … hydro storage, reduced wind, and some central North Island transmission outages. Hydro generation contributed 61%, wind …
Market Operations - Weekly Report - 19 January 2025.pdf
(PDF 2.59 MB)
Last updated: 12 Aug 2024
Evolving Market Resource Coordination
… data centre growth: Whakamana i Te Mauri Hiko Monitoring Report - October 2023 2 This can be seen in the future … https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment … of ancillary services purchased by the system operator.” 4 Transmission connected generation and embedded generation …
Evolving_Market _Resource_Coordination_FINAL.pdf
(PDF 1021.86 KB)
Last updated: 06 Dec 2022
RCP4 Consultation Summary of Feedback
… 4 2.4 Transmission Pricing Methodology … As per one submitters request, we will publish the final report from our Independent Verifier when we receive it. … limit. 2.8 Investment approach Electra supports proactive planning for the electrification of both transport and …
RCP4 Consultation Summary December 2022.pdf
(PDF 566.17 KB)
Last updated: 06 Sep 2024
Northland Loss of Supply Investigation (System Operator-Commissioned).pdf
… maintenance. The two 220 kV circuits run on a single transmission line. The event required the Northland regional … the 220 kV circuits was livened on Sunday 23 June 2024. The report, commissioned by Transpower as system operator, … measurement unit PPO Principle performance obligation PPS Planning and Project Support (team within Operations …
Last updated: 20 Nov 2023
Upper South Island Summary of Submissions November 2023
… primarily focused on our request for information for non- transmission solutions. These submissions are being treated … from distribution companies through the annual Transmission Planning Report process. On the Investment Test parameters proposed …
USI - Summary of Submissions November 2023.pdf
(PDF 698.32 KB)
Last updated: 20 Dec 2024
TPR 2024 - Appendix B - Fault Levels
… Appendix B: Indicative forecast fault levels 2024 Annual Planning Report © Transpower New Zealand Limited 2024. All rights … ground fault current, respectively, for all of Transpower’s transmission buses. Both tables list the 10-year forecast …
TPR 2024 - Appendix B - Fault Levels.pdf
(PDF 1017.06 KB)
Last updated: 01 Aug 2023
TP_SystemOperatorStrategicPlan_Jun23_03_FINAL-A.pdf
… operating is changing at an accelerating rate, evidenced by reports from groups such as the Market Development Advisory … to provide direction for our organisation’s more detailed planning for carrying out the system operator role, embodied … at lower cost than grid- connected generation and transmission assets? Using this evidence from overseas, we …
TP_SystemOperatorStrategicPlan_Jun23_03_FINAL-A.pdf
(PDF 5.09 MB)
Last updated: 20 Sep 2022
Submission Summary - Grid Service Engagement Paper
… 1. Planned outage performance to ensure efficient outage planning is achieved and 2. New grid connections to ensure … of future load forecasts. GP-M – Momentary Interruptions Reporting 10. Do you use the information reported on in the … (c) Given the uncertainties created by the shift to the new Transmission Pricing Methodology we recommend that …
RCP4 Submission Summary - Grid Service Engagement Paper
(PDF 585.99 KB)
