Resources
Displaying 1 - 10 of 24
Last updated: 08 Jan 2025
Online_Submission_National_infrastructure_Plan_due10Dec
… process and costs; and finding and funding personnel with planning capabilities and a workforce with delivery … investment framework obliges consideration of non-transmission solutions (i.e. paying for third party service) … Every year Transpower publishes its Transmission Planning Report to signal investment needs and potential options …
Online_Submission_National_infrastructure_Plan_due10Dec.pdf
(PDF 173.95 KB)
Last updated: 12 Dec 2024
Transpower Integrated Report FY24 final
… Integrated Report FY 2024 Optimising the transition D. 17 2024 1994 … over 100 years, our people have been the kaitiaki of the transmission lines and substations that form the National … for New Zealand OUR PURPOSE Transpower is responsible for planning, building, maintaining and operating the National …
Transpower Integrated Report FY24 final.pdf
(PDF 12.05 MB)
Last updated: 17 Apr 2025
Ancillary Services Procurement Plan 2025_CLEAN
… 15 System operator reporting to the Authority (clause 8.43(g) of the Code) … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch … generation output that supports the initial charging of transmission circuits and assets; B98.6 ensuring the black …
Ancillary Services Procurement Plan 2025_CLEAN.pdf
(PDF 660.85 KB)
Last updated: 17 Apr 2025
Ancillary Services Procurement Plan 2025_tracked changes
… 15 System operator reporting to the Authority (clause 8.43(g) of the Code) … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch … generation output that supports the initial charging of transmission circuits and assets;, and the progressive …
Ancillary Services Procurement Plan 2025_tracked changes.pdf
(PDF 763.25 KB)
Last updated: 17 Apr 2025
Ancillary Services Procurement Plan 2025_CLEAN
… services (clause 8.43(f) of the Code) 15 System operator reporting to the Authority (clause 8.43(g) of the Code) 16 … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch objective … generation output that supports the initial charging of transmission circuits and assets; ensuring the black start …
Ancillary Services Procurement Plan 2025_CLEAN.docx
(DOCX 196.65 KB)
Last updated: 17 Apr 2025
Ancillary Services Procurement Plan 2025_tracked changes
… services (clause 8.43(f) of the Code) 15 System operator reporting to the Authority (clause 8.43(g) of the Code) 16 … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch objective … generation output that supports the initial charging of transmission circuits and assets;, and the progressive …
Ancillary Services Procurement Plan 2025_tracked changes.docx
(DOCX 226.13 KB)
Last updated: 20 Dec 2024
WBoP - Attachment 1 - Compliance with the Capex IM
… investment need to be met, which may be either or both, a transmission investment or non-transmission solution; … of the investment need with our latest Transmission Planning Report (2023). The Transmission Planning Report is part of …
WBoP - Attachment 1 - Compliance with the Capex IM.pdf
(PDF 840.03 KB)
Last updated: 18 Dec 2024
USI - Attachment 1 - Need for Investment Demand and Generation Scenarios
… | December 2024 2 Figure 1: Upper South Island 220 kV transmission network 1.1.1 Prior investigations and … MCP, 13 February 2013. 5 This review reflected our general planning approach of regularly reviewing demand forecasts … Our planning studies that support our Transmission Planning Report9 (TPR) regularly assess the needs of the national …
Last updated: 20 Dec 2024
WBoP - Attachment 2 - Overview of need
… for this Major Capex Proposal (MCP). Figure 1: Map of the transmission infrastructure in the Bay of Plenty region The … be found in Chapter 10 of Transpower’s 2023 Transmission Planning Report (TPR) here. The need for investment discussed in this …
WBoP - Attachment 2 - Overview of need.pdf
(PDF 1.43 MB)
Last updated: 20 Dec 2024
WBoP - Attachment 5 - Options analysis
… but a different period can be used where appropriate. Some transmission assets have long lives, greater than 20 years, … investment options have been estimated using concept design reports or internal costs, depending on the level of … Practice (GEIP) and as such we have ensured that the planning and performance standards used to determine the …
WBoP - Attachment 5 - Options analysis.pdf
(PDF 869.67 KB)