Resources
Displaying 1 - 8 of 8
Last updated: 03 Mar 2025
TP_WACC_Attachment_C_Castalia Report on Rational Regulated Response.pdf
… Advisory Group. The Rational Response of a Regulated Transmission Company to a Low WACC Report to Transpower 1 May 2014 Confidential Acronyms and … GRS to its network. The GRS rely on forecasts that reflect planning, judgement and attitudes towards risk. Changing …
Last updated: 28 Apr 2025
Final Submission Emergency Management Bill
… owns and operates New Zealand’s high voltage electricity transmission network (The National Grid). The National Grid … Bill provides no indication of the degree of granularity of reporting required. The proactive reporting proposed under … and very costly, exercise for Transpower; 4.4 The “planning emergency levels of service” requirements need to …
Final Submission Emergency Management Bill.pdf
(PDF 363.7 KB)
Last updated: 03 Mar 2025
TP_WACC_Attach_C_Castalia_Rational Regulated Response
… Advisory Group. The Rational Response of a Regulated Transmission Company to a Low WACC Report to Transpower 1 May 2014 Confidential Acronyms and … GRS to its network. The GRS rely on forecasts that reflect planning, judgement and attitudes towards risk. Changing …
TP_WACC_Attach_C_Castalia_Rational Regulated Response.pdf
(PDF 693.34 KB)
Last updated: 27 Feb 2025
TP_Sub_Appendix_C_Castalia_Response_67_Percentile_WACC_29_Aug14.pdf
… June 2014 3 Castalia, “The Rational Response of a Regulated Transmission Company to a Low WACC” (report prepared for Transpower New Zealand Ltd, 1 May 2014) … electricity (due to a less optimal mix of generation and transmission).Because it is not obvious if economic …
Last updated: 27 Feb 2025
TranspowerTPM_Issues_and_Proposals
… Authority By email: [email protected] Dear Carl Transmission Pricing Methodology Consultation TlanspDWel … Electricity Authority Date: 1 March 2013 Contact Ross Parry Planning and Regulatory Manager 96 The Terrace WELLINGTON … directly part of our submission, we have attached the CEG report as Appendix B for completeness. CEG identified some …
TranspowerTPM_Issues_and_Proposals.pdf
(PDF 1.83 MB)
Last updated: 17 Mar 2025
TP_Sub_ Modernising conservation land management_redacted_Mar2025
… that owns and operates the National Grid – the high voltage transmission network connecting electricity generation with … our essential work. 3.1 We agree with issue 3.1, that the planning system is too complicated. To preserve the ability … and conditions, and if necessary, associated audit and reporting obligations, to provide assurances regarding …
Last updated: 28 Feb 2025
TP_Sub_ Modernising conservation land management redacted
… that owns and operates the National Grid – the high voltage transmission network connecting electricity generation with … our essential work. 3.1 We agree with issue 3.1, that the planning system is too complicated. To preserve the ability … and conditions, and if necessary, associated audit and reporting obligations, to provide assurances regarding …
TP_Sub_ Modernising conservation land management redacted.pdf
(PDF 285.57 KB)
Last updated: 26 Feb 2025
Submission on Local Government water Services Bill
… maintains, and owns and operates New Zealand’s high voltage transmission network (National Grid). Transpower’s primary focus is the provision of transmission infrastructure to support New Zealand’s … supply, create water safety plans and carry out testing and reporting for the taking of Council drinking water. This …
Submission on Local Government water Services Bill.pdf
(PDF 1.79 MB)