Resources
Displaying 101 - 110 of 197
Last updated: 23 Sep 2022
2022 ITP Glossary.pdf
… usually with changed values of voltage and current VoLL Value of Lost Load XLPE Cross linked polyethylene … …
2022 ITP Glossary.pdf
(PDF 189.34 KB)
Last updated: 03 Sep 2021
Integrated Transmission Plan - Glossary 2021.pdf
… usually with changed values of voltage and current VoLL Value of Lost Load XLPE Cross linked polyethylene … …
Integrated Transmission Plan - Glossary 2021.pdf
(PDF 199.45 KB)
Last updated: 29 Sep 2020
ITP Glossary 2020.pdf
… usually with changed values of voltage and current VoLL Value of Lost Load XLPE Cross linked polyethylene … ITP …
ITP Glossary 2020.pdf
(PDF 221.32 KB)
Last updated: 22 Nov 2018
2018 ITP Glossary - FINAL.pdf
… usually with changed values of voltage and current VoLL Value of Lost Load XLPE Cross linked polyethylene … …
2018 ITP Glossary - FINAL.pdf
(PDF 649.8 KB)
Last updated: 02 Dec 2022
s53ZD_AssetHealthNetworkRisk_Expert Opinion Progress Review Report_25Nov2022 .pdf
… loss (MWh) data based on site and network configuration, VoLL, and restoration time for HVDC assets. Model the … so far. While the theoretical concept (like diminishing VoLL as the outage prolongs to certain duration threshold … disregarding of embedded generations, sites with missing VoLL, reference to load curve or load blocks, VoLL …
Last updated: 13 Sep 2022
BRK-SFD Long List Consultation_0.pdf
… Value of expected unserved energy The Value of Lost Load (VoLL, also known as Value of Expected Unserved Energy) is … Schedule 12.2 of the code Question 10: Do you consider this VoLL ($26,200/MWh) appropriate for valuing unserved energy? … for this investigation? 10. Do you consider this VoLL ($26,200/MWh) appropriate for valuing unserved energy? …
BRK-SFD Long List Consultation_0.pdf
(PDF 1.24 MB)
Last updated: 10 Oct 2018
BRK-SFD Long List Consultation.pdf
… Value of expected unserved energy The Value of Lost Load (VoLL, also known as Value of Expected Unserved Energy) is … Schedule 12.2 of the code Question 10: Do you consider this VoLL ($26,200/MWh) appropriate for valuing unserved energy? … for this investigation? 10. Do you consider this VoLL ($26,200/MWh) appropriate for valuing unserved energy? …
BRK-SFD Long List Consultation.pdf
(PDF 1.24 MB)
Last updated: 15 Dec 2020
MEUG submission on TPM Options Consultation, Part B and Part C.pdf
… not be based on a single or small number of generalised VoLL estimates. Transpower proposes to depart from the …
Last updated: 27 Sep 2019
2017 ITP Services Report.pdf
… them against our estimated Value of Lost Load (VoLL). Generally the RCP 2 targets determined using these … of this review includes a review of value of lost load (VoLL) which is a key input into the categorisation review. … by customer category GP1 Categorisation to be aligned with VoLL Average duration of unplanned interruptions by customer …
2017 ITP Services Report.pdf
(PDF 4.12 MB)
Last updated: 26 Sep 2017
2017 ITP Services Report.pdf
… them against our estimated Value of Lost Load (VoLL). Generally the RCP 2 targets determined using these … of this review includes a review of value of lost load (VoLL) which is a key input into the categorisation review. … by customer category GP1 Categorisation to be aligned with VoLL Average duration of unplanned interruptions by customer …
2017 ITP Services Report.pdf
(PDF 4.12 MB)