Busbar Classification Review - Updated Credible Event Methodology and Trial Results.pdf
… calculated. Where load is lost or shed involuntarily, a VOLL of $25,000/MWh is used to price the cost of these … from the Electricity Authority’s Value of Lost Lost (VoLL). See the Load Duration Curve section for how the … shedding and is obtained from the Electricity Authority’s VoLL. Duration When considering CE classification during …
Last updated: 03 Mar 2023
Transpower submission: Cost of Capital - Frontier Report (3 February 2023)
… and b The increase in the estimated value of lost load (VoLL). 12. This results in a near doubling of the estimated … presented above uses historic evidence on real GDP and VoLL to update Oxera’s estimate. However, network companies …
Last updated: 17 Dec 2024
TP_Sub_25_26_Levy_Appropriations_13Dec2024_FINALpdf
… security of supply settings including Value of Lost Load (VOLL) and the Security Standards Assumptions Document (SSAD) …
TP_Sub_25_26_Levy_Appropriations_13Dec2024_FINALpdf.pdf
(PDF 178.31 KB)
Last updated: 09 Nov 2020
TPM Options Consultation - PART A. Overview.pdf
… TPM Transmission pricing methodology USI Upper South Island VoLL Value of Lost Load vSPD Vectorised Scheduling, pricing …
TPM Options Consultation - PART A. Overview.pdf
(PDF 1.84 MB)
Last updated: 09 Aug 2017
Busbar Classification - Recommendations from Updated Credible Event Methodology.pdf
… calculated. Where load was lost or shed involuntarily, a VOLL of $25,000/MWh was used to calculate the cost of these … and is the Electricity Authority’s Value of Lost Lost (VoLL). See the Load Duration Curve section for how the … unplanned load shedding and is the Electricity Authority’s VoLL. 3.5.3.3.5 Duration When considering CE classification …
Last updated: 29 Jun 2017
Busbar Classification Review.pdf
… calculated. Where load was lost or shed involuntarily, a VOLL of $25,000/MWh was used to calculate the cost of these … and is the Electricity Authority’s Value of Lost Lost (VoLL). See the Load Duration Curve section for how the … unplanned load shedding and is the Electricity Authority’s VoLL. 3.5.3.3.5 Duration When considering CE classification …
Busbar Classification Review.pdf
(PDF 5.34 MB)
Last updated: 13 Dec 2019
WUNIVM Major Capex Proposal.pdf
… in the WUNI region we have used a Value of Lost Load (VoLL) equal to $26,500/MWh. This number is based on the … -$21 -$14 $8 EDGS Global $0 -$579 $90 $93 $24 $24 $34 +50% VoLL $0 -$566 $241 $240 $188 $155 $124 -50% VoLL $0 -$792 $59 $61 -$20 -$21 -$4 95% HLY U5 availability …
WUNIVM Major Capex Proposal.pdf
(PDF 1.46 MB)
Last updated: 20 Nov 2023
Upper South Island Summary of Submissions November 2023
… for our proposed discount rates and value of lost load (VOLL). Christchurch Airport have suggested that we use a …
USI - Summary of Submissions November 2023.pdf
(PDF 698.32 KB)
Last updated: 14 Aug 2024
Waikato Regional Interconnection Capacity Project - Summary of submissions.pdf
… unserved energy? Four submitters agreed with the proposed VoLL with Waipā Networks noting that “the sensitivity …
Last updated: 05 Dec 2022
NZGP1 MCP ATTACHMENT C - OPTIONS REPORT.pdf
… Value of expected unserved energy The Value of Lost Load (VoLL – also known as Value of Expected Unserved Energy), is … The Electricity Industry Participation Code specifies that VoLL should be $20,000/MWh. This value was determined in … inflation, equates to approximately $29,500/MWh in $2022. VoLL is not relevant to this analysis and the value has not …
NZGP1 MCP ATTACHMENT C - OPTIONS REPORT.pdf
(PDF 1.26 MB)