Resources
Displaying 161 - 170 of 197
Last updated: 12 May 2022
Grid Service Engagement Paper May 2022.pdf
… assets Assets that provide the power transmission service. VoLL Value of Lost Load. TRANSPOWER NEW ZEALAND | RCP4 GRID …
Grid Service Engagement Paper May 2022.pdf
(PDF 1.21 MB)
Last updated: 19 Jan 2022
TPM cross - submission Revised TPM Drafting.pdf
… has the meaning in the Transpower IMs value of lost load or VOLL means, for a reliability BBI— (a) if the reliability … group is a regional demand group, the reliability BBI’s VOLL; or (b) if the regional customer group is a regional … same value of unserved energy, being the reliability BBI’s VOLL; and (c) all regional supply groups, and all members of …
TPM cross - submission Revised TPM Drafting.pdf
(PDF 2.9 MB)
Last updated: 20 Sep 2021
4 Part 2 resubmitted proposed TPM changes tracked with comments.pdf
… has the meaning in the Transpower IMs value of lost load or VOLL means, for a reliability BBI— (a) if the reliability … group is a regional demand group, the reliability BBI’s VOLL; or Electricity Industry Participation Code 2010 … same value of unserved energy, being the reliability BBI’s VOLL; and (c) all regional supply groups, and all members of …
Last updated: 30 Aug 2021
Part 1 resubmitted proposed TPM changes tracked with comments.pdf
… has the meaning in the Transpower IMs value of lost load or VOLL means, for a reliability BBI— (a) if the reliability … group is a regional demand group, the reliability BBI’s VOLL; or (b) if the regional customer group is a regional … same value of unserved energy, being the reliability BBI’s VOLL; and (c) all regional supply groups, and all members of …
Last updated: 03 Dec 2021
Transpower submission - Attachment B - revised proposed TPM (021221).pdf
… has the meaning in the Transpower IMs value of lost load or VOLL means, for a reliability BBI— (a) if the reliability … group is a regional demand group, the reliability BBI’s VOLL; or (b) if the regional customer group is a regional … same value of unserved energy, being the reliability BBI’s VOLL; and (c) all regional supply groups, and all members of …
Last updated: 27 Apr 2023
TPM Consultation NZGP phase 1 starting BBI customer allocations (Draft Record - HVDC Reactive Support ).pdf
… Time weighted average price VoLG Value of lost generation VoLL Value of lost load …
Last updated: 23 Sep 2022
Grid Service Measures Engagement Paper 2 (Annex).pdf
… environmental impacts of adverse grid events. of Lost Load (VoLL). Also refer to question 6 in this table. 3. Do you …
Grid Service Measures Engagement Paper 2 (Annex).pdf
(PDF 1.84 MB)
Last updated: 23 Sep 2022
Grid Service Measures Engagement Paper 2 (Annex).pdf
… environmental impacts of adverse grid events. of Lost Load (VoLL). Also refer to question 6 in this table. 3. Do you …
Grid Service Measures Engagement Paper 2 (Annex).pdf
(PDF 1.84 MB)
Last updated: 29 Mar 2022
SOSFIP and EMP consultation 2022.pdf
… associated with the timing and occurrence of this response. VoLL Value of Lost Load SOSFIP/EMP Review 2022 – …
SOSFIP and EMP consultation 2022.pdf
(PDF 1.42 MB)
Last updated: 09 Aug 2021
Proposed TPM 30 June 2021 compared TPM Preliminary Drafting 3 May 2021.docx
… has the meaning in the Transpower IMs value of lost load or VOLL means, for a reliability BBI — 0. if the reliability … group is a regional demand group , the reliability BBI’s VOLL ; or (b) if the regional customer group is a regional … reliability disbenefit) V is the relevant reliability BBI’s VOLL . S is the number of market scenarios for the …