Resources
Displaying 181 - 190 of 197
Last updated: 25 Nov 2024
2 - Final Assumptions Book v2.0 - tracked changed
… TWh TeraWatt hour (energy) VoLG Value of lost generation VoLL Value of lost load VWF Virtual wind farm … energy (MWh) multiplied by the value of lost load (VoLL) or value of lost generation (VoLG) ($/MWh), where the …
2 - Final Assumptions Book v2.0 - tracked changed.pdf
(PDF 3.49 MB)
Last updated: 07 Oct 2024
2 - Draft Assumptions Book v2.0 - tracked changes.pdf
… TWh TeraWatt hour (energy) VoLG Value of lost generation VoLL Value of lost load VWF Virtual wind farm … energy (MWh) multiplied by the value of lost load (VoLL) or value of lost generation (VoLG) ($/MWh), where the …
2 - Draft Assumptions Book v2.0 - tracked changes.pdf
(PDF 3.69 MB)
Last updated: 14 Feb 2024
TPM - BBC Assumptions Book v1.2 - 14Feb2024 - tracked changes.pdf
… Time weighted average price VoLG Value of lost generation VoLL Value of lost load Deleted: e Deleted: Software | PSR – … energy (MWh) multiplied by the value of lost load (VoLL) or value of lost generation (VoLG) ($/MWh), where the …
Last updated: 14 Feb 2024
TPM - BBC Assumptions Book v1.2 - 14Feb2024 - clean.pdf
… Time weighted average price VoLG Value of lost generation VoLL Value of lost load https://www.psr-inc.com/en/software/ … energy (MWh) multiplied by the value of lost load (VoLL) or value of lost generation (VoLG) ($/MWh), where the …
TPM - BBC Assumptions Book v1.2 - 14Feb2024 - clean.pdf
(PDF 3.66 MB)
Last updated: 10 Feb 2023
TPM Consultation BBC Assumptions Book v1.1 Draft for consultation 10 Feb reissue.pdf
… Time weighted average price VoLG Value of lost generation VoLL Value of lost load … energy (MWh) multiplied by the value of lost load (VoLL) or value of lost generation (VoLG) ($/MWh), where the …
Last updated: 25 May 2021
47. 24 May 2021 - Letter from EA (Transpower TPM Checkpoint 2B resubmission Appendix E comments on preliminary drafting of proposed TPM).pdf
… of commissioned asset has the meaning in the Transpower IMs VOLL means, for a reliability BBI— (m) if the reliability … reliability disbenefit) V is the relevant reliability BBI’s VOLL. (5) The illustrative system limit model below shows …
Last updated: 13 Sep 2022
Waikato and Upper North Island Voltage Management long-list consultation_2.pdf
… North Island Dynamic Reactive Support (a specific GUP) VOLL Value of lost load WUNI Waikato and Upper North Island …
Last updated: 21 Nov 2023
RCP4 Independent Verification Report.pdf
… e.g., spare capacity, back feed capability, use of standard VoLL, demand forecast, N/N-1 constraints, unserved energy, … contributes to partial realisation of Value of Lost Load (VOLL), opex efficiency and capex reduction benefits gained … SCADA systems. It will enable the full realisation of VOLL, opex efficiency and capex reduction benefits gained …
RCP4 Independent Verification Report.pdf
(PDF 11.18 MB)
Last updated: 15 Sep 2023
IV RCP4 report - Final 2023.09.12.pdf
… e.g., spare capacity, back feed capability, use of standard VoLL, demand forecast, N/N-1 constraints, unserved energy, … contributes to partial realisation of Value of Lost Load (VOLL), opex efficiency and capex reduction benefits gained … SCADA systems. It will enable the full realisation of VOLL, opex efficiency and capex reduction benefits gained …
IV RCP4 report - Final 2023.09.12.pdf
(PDF 11.18 MB)
Last updated: 28 Sep 2015
TP AMP 2015.pdf
… the value of reliability (termed the value of lost load, or VoLL) within our framework for setting reliability targets • …
TP AMP 2015.pdf
(PDF 2.42 MB)