Resources
Displaying 21 - 30 of 197
Last updated: 06 Apr 2017
Engagement Paper 2 - April 2017.pdf
… each POS would be calculated by using Value of Lost Load (VoLL), the level of demand, and the type of load supplied. … by customer category GP1 Categorisation to be aligned with VoLL Average duration of unplanned interruptions by customer … category (min/yr) GP2 Categorisation to be aligned with VoLL Availability % availability of HVDC AP1 Refined to …
Engagement Paper 2 - April 2017.pdf
(PDF 1.21 MB)
Last updated: 05 Apr 2017
Engagement Paper 2.pdf
… each POS would be calculated by using Value of Lost Load (VoLL), the level of demand, and the type of load supplied. … by customer category GP1 Categorisation to be aligned with VoLL Average duration of unplanned interruptions by customer … category (min/yr) GP2 Categorisation to be aligned with VoLL Availability % availability of HVDC AP1 Refined to …
Engagement Paper 2.pdf
(PDF 1.2 MB)
Last updated: 13 Mar 2017
Attach C CPK-WIL B Line Reconductoring - WE submission Jan 2016.pdf
… EXPECTED UNSERVED ENERGY FOR THIS ANALYSIS? No The original VoLL figure of $20,000/MWh is a value averaged for the … studies around the world have come up with much higher VoLL figures for the commercial sector than the other … CBD, Wellington Electricity is of the opinion that a VoLL of $26,000/MWh is not sufficient and should be …
Last updated: 05 Feb 2019
BRK-SFD- Long List Summary of Submissions.pdf
… No response. 7 Value of Lost Load Q10 Do you consider this VoLL ($26,200/MWh) appropriate for valuing unserved energy? Methanex suggested that VoLL of $26,200/MWh may be appropriate for general … is happy to consider information relating to alternative VoLLs. To support any application to the Commerce Commission …
BRK-SFD- Long List Summary of Submissions.pdf
(PDF 685.33 KB)
Last updated: 05 Feb 2021
4. 14 Aug 2020 - TPM Development Checkpoint 1 submission to the Electricity Authority (Benefit-Based Charge).pdf
… requirements, Regional network model, Value of lost load (VoLL) Assumption Book on a time bound review and … Load Forecast, Generation Forecast, Value of Lost Load (VOLL), Value of Foregone Generation (VOFG) Power Systems … volume used for both load and generation. Load valued at VoLL, generation at VoFG 0% X% 100% Demand limit after …
Last updated: 27 Jan 2021
4. 14 Aug 2020 TPM Development Checkpoint 1 submission to the Electricity Authority (Benefit-Based Charge).pdf
… requirements, Regional network model, Value of lost load (VoLL) Assumption Book on a time bound review and … Load Forecast, Generation Forecast, Value of Lost Load (VOLL), Value of Foregone Generation (VOFG) Power Systems … volume used for both load and generation. Load valued at VoLL, generation at VoFG 0% X% 100% Demand limit after …
Last updated: 23 Jul 2018
Interconnecting Transformer Classification - Summary of Submissions.pdf
… is load on N-security. We have used a value of lost load (VoLL) which is aligned with currently available regulatory … Our sensitivity test indicates that even using a high VoLL, it is still more economic to plan outages of these … the entire gas industry and believe the value of lost load (VoLL) is understated for this region. They propose NPL T8 …
Last updated: 14 May 2024
Waikato Regional MCP - Attachment 5 - Investment Test Parameters.pdf
… appropriate. We use an estimate of the value of lost load (VOLL) for the value of expected unserved energy. The VOLL is the estimated consumer value lost because of an unplanned electricity supply outage. We use the VOLL to assess reliability benefits of different options. …
Last updated: 22 Jul 2019
BOB-OTA Investigation - Long-List Consultation RFI Response - Counties Power.pdf
… would be more suitable. 7. Do you consider that our VoLL values of $26,400/MWh for Bombay and $27,800/MWh for … appropriate for valuing unserved energy? We consider that a VoLL value of $26,400/MWh is appropriate for Bombay for …
Last updated: 18 Nov 2020
20200221 Counties Power Response to Bombay Otahuhu MCP Investigation.pdf
… We consider the discount rate (7%), value of lost load (VoLL) applied at Bombay GXP ($26,400/MWh) and 32 year … project? For options which include load shedding, do the VoLL calculations include costs due to planned and unplanned …