Focus Group session slides 21 June 18.pdf
… • results of our recently completed Value of Lost Load (VoLL) study • for measures AP2 and AP3, identifying which … the amount of load being served at a POS multiplied by the VoLL at that POS, and is the expected dollar cost of an … are broken down broadly into the following types: Step 2: A VoLL for each type of consumer is established. Step 3: The …
Focus Group session slides 21 June 18.pdf
(PDF 507.15 KB)
Last updated: 28 Sep 2015
TP Services Report.pdf
… This is traditionally termed the ‘value of lost load’ (or VoLL) in New Zealand. There are limits on the usefulness of VoLL information (most of our grid connection points serve a … but it is worth investigating whether we can use better VoLL information to improve the economic basis for our …
TP Services Report.pdf
(PDF 903.89 KB)
Last updated: 15 Dec 2020
NZ Steel submission on TPM Options Consultation, Part B and Part C.pdf
… Standard Method – customer benefit, reliability. A standard VoLL number is not an appropriate measure for direct connect … re “…it varies widely by the type of load…”. Also para 231 ”VoLL is therefore likely to be situationally specific and …
Last updated: 01 Oct 2019
BPE-WIL A Reconductoring Preferred Option.pdf
… rate as outlined in the Capex IM. • Value of Lost Load (VoLL): $25,300/MWh based on the Code8-defined as $20k/MWh in … / +25% • Discount rate: +4% / + 10% • Reliability: +25% • VoLL: -50% / +50% Each row shows the impact from changing … 25% -$ 8.2m $ 17.1m $ 17.1m $ 17.2m $ 17.8m $ 18.0m $ 21.2m VoLL -50% -$ 8.2m -$ 1.9m -$ 1.9m -$ 1.8m -$ 1.2m -$ 0.9m $ …
BPE-WIL A Reconductoring Preferred Option.pdf
(PDF 1.44 MB)
Last updated: 15 Mar 2018
BPE-WIL A Reconductoring Preferred Option.pdf
… rate as outlined in the Capex IM. • Value of Lost Load (VoLL): $25,300/MWh based on the Code8-defined as $20k/MWh in … / +25% • Discount rate: +4% / + 10% • Reliability: +25% • VoLL: -50% / +50% Each row shows the impact from changing … 25% -$ 8.2m $ 17.1m $ 17.1m $ 17.2m $ 17.8m $ 18.0m $ 21.2m VoLL -50% -$ 8.2m -$ 1.9m -$ 1.9m -$ 1.8m -$ 1.2m -$ 0.9m $ …
BPE-WIL A Reconductoring Preferred Option.pdf
(PDF 1.44 MB)
Last updated: 29 May 2020
Contact submission CUWLP 2020.pdf
… in spill and fuel costs, while under an import scenario VOLL costs should be included. Both circuits are on the same … would increase with the decarbonisation of regional demand. VOLL costs need to be considered in the CBA under these … while CUWLP works were being completed. We consider that VOLL costs need to be factored into the CBA under these …
Contact submission CUWLP 2020.pdf
(PDF 609.93 KB)
Last updated: 22 Jun 2020
BOB-OTA MCP - Attachment C - Options and costing report.pdf
… the SPS itself plus the expected unserved energy valued at VoLL was included in the overall costs b. using demand … in the Bombay region we have used a Value of Lost Load (VoLL) of $26,400/MWh for Bombay and $27,800/MWh for Wiri … these values as we consider them a better representation of VoLL at these GXPs. We note that our sensitivity range fully …
Last updated: 01 Jul 2015
Transpower-2015_16-Initiatives-Plan.pdf
… This is traditionally termed the “value of lost load” (or VoLL) in New Zealand. There are limits on the usefulness of VoLL information (most of our grid connection points serve a … but it is worth investigating whether we can use better VoLL information to improve the economic basis for our …
Transpower-2015_16-Initiatives-Plan.pdf
(PDF 5.16 MB)
Last updated: 24 May 2017
Service Performance Measure Refresh RCP3_ April 2017.pdf
… by customer category GP1 Categorisation to be aligned with VoLL Average duration of unplanned interruptions by customer … category (min/yr) GP2 Categorisation to be aligned with VoLL Availability % availability of HVDC AP1 Refined to …
Service Performance Measure Refresh RCP3_ April 2017.pdf
(PDF 1.15 MB)
Last updated: 07 Sep 2017
Battery Storage in New Zealand.pdf
… factors that go into determining the Value of lost load (Voll) for each customer classification and geographical … Our assumption in this report is based on the 2013 EA Voll Survey6 Table 1. Refer to Appendix for a break-down by … - Report on methodology and key findings, 23 July 2013 VOLL: http://www.ea.govt.nz/dmsdocument/15385 …
Battery Storage in New Zealand.pdf