Resources
Displaying 91 - 100 of 197
Last updated: 12 Apr 2017
Industry Workshops Apr 2017.pdf
… by customer category GP1 Categorisation to be aligned with VoLL Average duration of unplanned interruptions by customer … category (min/yr) GP2 Categorisation to be aligned with VoLL Availability % availability of HVDC AP1 Refined to …
Industry Workshops Apr 2017.pdf
(PDF 2.07 MB)
Last updated: 06 Mar 2014
Mangamaire Grid Reconfiguration.pdf
… energy not served is around $270 with a value of lost load (VOLL) of $20,000 per MWh. The upper bound for expected …
Mangamaire Grid Reconfiguration.pdf
(PDF 356.08 KB)
Last updated: 06 Mar 2014
Mangamaire Grid Reconfiguration June Update.pdf
… energy not served is around $270 with a value of lost load (VOLL) of $20,000 per MWh. The upper bound for expected …
Mangamaire Grid Reconfiguration June Update.pdf
(PDF 772.08 KB)
Last updated: 20 Dec 2024
WBoP - Attachment 5 - Options analysis
… 527.1 Capital decrease (70% of base) 767.3 788.8 774.5 High VoLL ($60,000/MWh) 751.2 791.2 767.6 Low VoLL ($20,000/MWh) 617.5 628.2 603.7 The sensitivity …
WBoP - Attachment 5 - Options analysis.pdf
(PDF 869.67 KB)
Last updated: 15 Dec 2020
Meridian submission on TPM Options Consultation, Part B.pdf
… broadly reasonable. However, given the value of lost load (VoLL) basis for the approach, the allocation of reliability … – for generators the benefit would not be based on VoLL but on the value of lost generation at prevailing spot …
Meridian submission on TPM Options Consultation, Part B.pdf
(PDF 344.51 KB)
Last updated: 15 Jun 2018
Engagement Paper 3 (June 2018).pdf
… results of our recently completed Value of Lost Load (VoLL) study for measures AP2 and AP3, identifying which … the amount of load being served at a POS multiplied by the VoLL at that POS, and is the expected dollar cost of an … like access to more detailed information on the demand and VoLL assumptions. Engagement Question 2 As a result of …
Engagement Paper 3 (June 2018).pdf
(PDF 880.53 KB)
Last updated: 18 Oct 2024
HVDC Single Pole Risk Classification.pdf
… similar to the last two years. • Value of Lost Load (VoLL) is $32,700/MWh. This is the value found in the … 4 Transpower as Grid Owner recently consulted regarding VoLL. For more information, please refer to Waikato Regional …
HVDC Single Pole Risk Classification.pdf
(PDF 624.25 KB)
Last updated: 27 Feb 2025
TranspowerTPM_Issues_and_Proposals
… are assigned to unserved demand – the ‘value of lost load’ (VoLL)6 – and the time period over which benefits are … and so there is no reason to think that ‘locking-in’ VoLL, the capping period and so on would prevent parties … is assigned to unserved demand – the ‘value of lost load’ (VoLL), i.e., the value that customers place on network …
TranspowerTPM_Issues_and_Proposals.pdf
(PDF 1.83 MB)
Last updated: 18 Mar 2013
ea-submission-on-transmission-pricing-methodology.pdf
… are assigned to unserved demand – the ‘value of lost load’ (VoLL)6 – and the time period over which benefits are … and so there is no reason to think that ‘locking-in’ VoLL, the capping period and so on would prevent parties … is assigned to unserved demand – the ‘value of lost load’ (VoLL), i.e., the value that customers place on network …
ea-submission-on-transmission-pricing-methodology.pdf
(PDF 1.85 MB)
Last updated: 23 Sep 2022
2022 ITP Glossary.pdf
… usually with changed values of voltage and current VoLL Value of Lost Load XLPE Cross linked polyethylene … …
2022 ITP Glossary.pdf
(PDF 189.34 KB)