Resources
Displaying 1031 - 1040 of 1206
Last updated: 23 Aug 2018
Media release Transpower releases 2017 18 Annual Result.pdf
… arrangements set by the Commerce Commission to determine transmission revenues. • Operating expenses were $293.9 … the implications for Auckland.” Transpower’s full annual report will not be available until tabled in Parliament …
Media release Transpower releases 2017 18 Annual Result.pdf
(PDF 111.19 KB)
Last updated: 20 Apr 2018
TranspowerHVDCSunkCostRecoveryPricingMethodology19April1999.pdf
… revenue requirement, and is not discussed here. A separate report on the Optimised Deprival Value of Transpower’s Fixed … achieve this, Transpower must recover the sunk costs of its transmission assets. The SCI stipulates also that … year, and from year to year, facilitate effective business planning, including of new investment. From Transpower’s …
TranspowerHVDCSunkCostRecoveryPricingMethodology19April1999.pdf
(PDF 286.06 KB)
Last updated: 06 Oct 2023
2019 TRANSPOWER Submission on proposed NPS for Highly Productive Land.pdf
… benefits of highly productive land being considered in planning and consenting processes? No comment. Section 3.2: … with the National Policy Statement on Electricity Transmission 2008 (the NPSET). The NPSET was developed under … Climate Change Committee’s “Electricity Inquiry – Final Report” reinforced the importance of electrification to …
Last updated: 25 Jan 2023
Customer ICCP Interconnection Policy
… 26 E. PRO-FORMA DATA TRANSMISSION AGREEMENT … of each of the parties, together with contact details for reporting problems. 5.3 Requests for New RTU-based SCADA … to this must be approved by the Secondary Systems AM Planning Manager. Where a direct connection is permitted the …
GC 29.01.pdf
(PDF 2.22 MB)
Last updated: 06 Dec 2022
Market Operations - Weekly Market Movements - 4 December 2022.pdf
… the warmer and lighter season with lower demand. The NZGB report for November 2022, covering the next six months, is … detail on the 1st of December price separation. Several transmission constraints were briefly binding over the week, … North Island. These were due to a combination of planned transmission outages and high north flow. Generation Mix …
Last updated: 09 Aug 2017
Busbar Classification - Recommendations from Updated Credible Event Methodology.pdf
… Website: http://www.transpower.co.nz SYSTEM OPERATIONS REPORT: BUSBAR CLASSIFICATION REVIEW 4 Contents 1 Executive … in this report in line with organisational priorities and planning. SYSTEM OPERATIONS REPORT: BUSBAR CLASSIFICATION … Loss of three Roxburgh generators Consequence: Loss of the transmission circuits during low Manapouri generation will …
Last updated: 29 Jun 2017
Busbar Classification Review.pdf
… Website: http://www.transpower.co.nz SYSTEM OPERATIONS REPORT: BUSBAR CLASSIFICATION REVIEW 3 Contents 1 Executive … in this report in line with organisational priorities and planning. SYSTEM OPERATIONS REPORT: BUSBAR CLASSIFICATION … Loss of three Roxburgh generators Consequence: Loss of the transmission circuits during low Manapouri generation will …
Busbar Classification Review.pdf
(PDF 5.34 MB)
Last updated: 23 Aug 2019
Financial Statements 2018_19 FINAL.pdf
… Trade and other payables 12 Provisions 13 Equity 14 Segment reporting 15 Change in fair value of financial instruments … 31 32 2. Operating revenue and deferred income Description Transmission revenue Transmission revenue consists of charges for the …
Financial Statements 2018_19 FINAL.pdf
(PDF 10.2 MB)
Last updated: 23 Aug 2019
Financial Statements 2018_19 FINAL.pdf
… Trade and other payables 12 Provisions 13 Equity 14 Segment reporting 15 Change in fair value of financial instruments … 31 32 2. Operating revenue and deferred income Description Transmission revenue Transmission revenue consists of charges for the …
Financial Statements 2018_19 FINAL.pdf
(PDF 10.2 MB)
Last updated: 29 Sep 2020
ITP Narrative 2020 - Schedules.pdf
… Integrated Transmission Plan 2020 Schedules Transpower New Zealand Ltd … For more details refer to Chapter 4 of the Transmission Planning Report Projects Outputs Status Estimated cost (nominal) …
ITP Narrative 2020 - Schedules.pdf
(PDF 650.08 KB)