Last updated: 14 Jul 2016
TPR15917 Development GuideWEBFINAL.pdf
… or first-time developer, it can appear daunting planning and designing around high voltage transmission lines, so we’ve put this easy to follow guide … are rare and may indicate a problem with the line. Always report flashovers. INSULATOR Insulators (or an insulator …
TPR15917 Development GuideWEBFINAL.pdf
(PDF 23.85 MB)
Last updated: 26 Nov 2019
Folder Reference Index.pdf
… of mutual interest drawings TP.GL 00.01 Management of transmission line drawings policy RECORD OF AMENDMENTS Issue … by the Transpower System Operations - Investigation & Planning - Ops Planning Senior Commissioner and they are … details, manufacturer (stress tables, outlines, etc.), test reports, loading diagrams (includes …
Folder Reference Index.pdf
(PDF 1.13 MB)
Last updated: 06 Nov 2020
Pre-reading EDGS 2019 - consultation document.pdf
… policy and technology dimensions. The EDGS are used in our transmission investment investigations. Transpower can … in order to recover our costs. We undertake long-term planning to forecast the level of transmission services we … for the other scenarios. We have yet to do that, but would report our assumptions on December 2, for review, if we do …
Pre-reading EDGS 2019 - consultation document.pdf
(PDF 319.54 KB)
Last updated: 02 Aug 2019
TP Sub Further IMs amendments 1 August 2019.pdf
… low emissions pathway New Zealand is currently on. In its report released in July, the Interim Climate Change … more wind farms, more geothermal and solar generation, more transmission lines, and possibly more hydro storage.”3 To … benefits to consumers. As we outlined in our Transmission Planning Report 2018, system needs arise from “a myriad of …
TP Sub Further IMs amendments 1 August 2019.pdf
(PDF 739.97 KB)
Last updated: 24 Sep 2024
Market Operations - Weekly Market Movements - 22 September 2024.pdf
… more closely through the market schedules. The latest NZGB report is available on the NZGB website. Electricity Market … https://www.transpower.co.nz/system-operator/notices-and-reporting/weekly-reporting/electricity-risk-curves … planned and unplanned outages to other generation units, transmission outages that were constraining generation, low …
Last updated: 20 Dec 2019
ERC Thermal Scenarios - December 2019.pdf
… with the reduced gas scenario used in the latest NZGB Report. This scenario is a conservative approach to … a major infrastructure failure – the complete loss of gas transmission to major North Island electricity generators … both the ERCs and SSTs are impacted by the loss of gas transmission in the North Island. In this scenario, the …
ERC Thermal Scenarios - December 2019.pdf
(PDF 706.03 KB)
Last updated: 12 Nov 2014
TP_Sub_Problem_Definition_WP_28 Oct 2014.pdf
… Box 10041 WELLINGTON 6143 By email: [email protected] Transmission pricing methodology: problem definition working … Initial Consultation Paper, August 2014. 19 NZIER report to New Zealand Aluminium Smelters Ltd, Accommodating … connects) or any other party involved in the investment planning process 2. Increasing competition and political …
TP_Sub_Problem_Definition_WP_28 Oct 2014.pdf
(PDF 703.07 KB)
Last updated: 27 Sep 2021
20210923 - AS Tender 2021 - Standard Terms Schedule - BSFK.pdf
… or cancellation of another Offer under clause 3.5. 3.7 Reporting: If the Ancillary Service Agent cancels an Offer … under clause 3.5 or 3.6, the Ancillary Service Agent must report the cancellation or submission to the System Operator … and pager/mobile numbers specified in Appendix 3. 3.9 Transmission of Offers and Changes to Offers: Every Offer, …
20210923 - AS Tender 2021 - Standard Terms Schedule - BSFK.pdf
(PDF 205.67 KB)
Last updated: 19 Nov 2020
All FMD Submissions received.pdf
… We are committed to supporting this goal. Having transmission costs that are affordable, transparent and … and imminent. In particular, Transpower’s Te Mauri Hiko report forecasts that electricity demand in New Zealand will … are obtained if Transpower’s traditional centralised planning mindset is replaced by a customer centralised …
All FMD Submissions received.pdf
(PDF 1.82 MB)
Last updated: 21 Mar 2025
GL-EA-404 Generation Commissioning Process
… 10 3. Planning … flow of electricity across Transpower’s high-voltage transmission network. We are responsible for ensuring … you will provide modelling files and a connection studies report. ▪ Validated power system models: the System Operator … to prepare two important datasets as part of a data transmission contract. These are: ▪ a set of indications and …
GL-EA-404 Generation Commissioning Process.pdf
(PDF 1.31 MB)