Resources
Displaying 1081 - 1090 of 1206
Last updated: 29 Jul 2024
Grid Skills Assessment Policy.pdf
… 7 14 Reporting assessment decisions … processes, flexible enough to meet the needs of the transmission sector as well as the requirements of … professional conversation, and other tools such as reports, case studies, portfolios of evidence, and research … learner on how their performance may be strengthened. 14 Reporting assessment decisions 15.1 Assessment results are …
Grid Skills Assessment Policy.pdf
(PDF 282.86 KB)
Last updated: 30 Mar 2023
Transpower submission to Electricity Authority: Review of the consultation and feedback processes (March 2023)
… many participants3 (and potential future participants). Transmission grid capability and electricity system … of the dynamic nature of the power system, changes to transmission and other connected assets, and changes to … of Supply policies and the AUFLS Technical Requirements Report. Requiring two yearly reviews of these policies would …
TP_Sub_Review_Consultation_Feedback_21March2023.pdf
(PDF 641.75 KB)
Last updated: 12 Sep 2019
Waikato and Upper North Island Voltage Management Summary of Short-list Submissions test.pdf
… Contact encouraged us to consider whether an interim Non-Transmission Solution (NTS) could be provided to cover … with our approach to NTSs, with recommendations that our transmission proposal be flexible to an NTS that only … comments on the eight questions asked in the consultation report, plus general comments of relevance. The sub-section …
Last updated: 09 Sep 2019
Waikato and Upper North Island Voltage Management Summary of Short-list Submissions.pdf
… Contact encouraged us to consider whether an interim Non-Transmission Solution (NTS) could be provided to cover … with our approach to NTSs, with recommendations that our transmission proposal be flexible to an NTS that only … comments on the eight questions asked in the consultation report, plus general comments of relevance. The sub-section …
Last updated: 24 Aug 2021
Transpower FS 20-21.pdf
… statem ents Tran sp o w er Integ rated R ep o rt 20 20 /21 Reporting entity and statutory base Transpower New Zealand … revenue and deferred income 2021 2020 Group ($M) Group ($M) Transmission revenue HVAC interconnection 603.3 641.4 HVAC … 134.7 EV (rebate) charge - HVDC (0.8) (3.0) Other regulated transmission 4.0 5.3 Customer investment contracts 23.0 30.6 …
Transpower FS 20-21.pdf
(PDF 8.01 MB)
Last updated: 12 Mar 2024
Market Operations - Weekly Market Movements - 10 March 2024.pdf
… to 180 MW on 29 April since last week. The latest NZGB report is available on the NZGB website. Electricity Market … take effect Shoulder ratings will apply to some grid transmission circuit ratings from 15 March to 10 May. See … [email protected] Hydro data used in this report is sourced from NZX Hydro. Electricity risk curves …
Last updated: 23 Feb 2021
21. 16 Nov 2020 - TPM Development Checkpoint 2 submission to the Electricity Authority (Residual Charge and Transitional Cap).pdf
… large offtake plant, large generating station or designated transmission customer been fully operational from 1 July … the TPM to avoid creating incentives for customers to avoid transmission charges in ways that cause economic … year 2019, as disclosed in capped offtake customer c’s Report on Billed Quantities and Line Charge Revenues …
Last updated: 20 Apr 2020
Electricity Risk Curve Assumptions.pdf
… 13 2.7 Transmission … wholesale electricity market. This forecast also excludes transmission losses. The tables below show total annual GWh … of hydro storage are summarised below. The System Operator reports on aggregate available hydro storage relative to the … by restricting the outflow of water from Lake Pukaki. 2.7 TRANSMISSION ASSUMPTIONS The Energy Link model includes a …
Electricity Risk Curve Assumptions.pdf
(PDF 1.19 MB)
Last updated: 08 Aug 2023
Market Operations - Weekly Market Movements - 6 August 2023.pdf
… outages on days with N-1- G shortfalls. The latest NZGB report is available on the NZGB website. Electricity Market … was dispatched). Auckland is at the northern end of the transmission network, so a higher proportion of load in Auckland will usually result in greater transmission losses. Load Load Load + Losses Load + Losses …
Last updated: 17 Jul 2023
Part D GZ13 Otago.pdf
… 4.1 to 4.5 below, these form the base assumptions for this report: ▪ Studholme is supplied from Waitaki in Winter, with … before the voltage and thermal issues identified in this report, particularly for planned outages of 220 kV circuits … ceases operation in 2025, this will be the only remaining transmission constraint binding in this scenario for both …
Part D GZ13 Otago.pdf
(PDF 778.72 KB)