Resources
Displaying 121 - 130 of 1206
Last updated: 11 Jun 2018
TP_Sub_PC_draft_report_low_emissions_economy_8June2018 (2).pdf
… [email protected] Low-emissions economy draft report Transpower commends the Productivity Commission … importance of actionable prices, coherent distribution and transmission pricing, the value of peak-usage pricing in … a critical issue that must be addressed through coordinated planning, innovation and investment. Peaks in demand for …
TP_Sub_PC_draft_report_low_emissions_economy_8June2018 (2).pdf
(PDF 750.41 KB)
Last updated: 05 Jan 2018
Asset Management Plan 2017_01.pdf
… of three supporting documents within our 2017 Integrated Transmission Plan (ITP), as illustrated in Figure 1. Figure … that has gone into refreshing and renewing our strategy, planning, and delivery functions. It incorporates our … is discussed within the 2017 Transmission Planning Report. All data in figures and tables is at 30 June 2017, …
Asset Management Plan 2017_01.pdf
(PDF 7.73 MB)
Last updated: 30 Sep 2020
Transpower Annual Report 19-20 Final Screen.pdf
… 14 Principle 3: Board committees 16 Principle 4: Reporting and disclosure 18 Statement of Corporate Intent … Committee (established during the 2019/20 year); and • Transmission Pricing Methodology Committee (established … risks and opportunities and fully integrate into strategic planning and decision making Principles on how an investment …
Transpower Annual Report 19-20 Final Screen.pdf
(PDF 5.16 MB)
Last updated: 30 Sep 2020
Transpower Annual Report 19-20 Final Screen.pdf
… 14 Principle 3: Board committees 16 Principle 4: Reporting and disclosure 18 Statement of Corporate Intent … Committee (established during the 2019/20 year); and • Transmission Pricing Methodology Committee (established … risks and opportunities and fully integrate into strategic planning and decision making Principles on how an investment …
Transpower Annual Report 19-20 Final Screen.pdf
(PDF 5.16 MB)
Last updated: 23 Aug 2019
Annual Report 2018_19 FINAL compressed.pdf
… Annual Report 2018/19 D.17 CONTENTS Corporate Governance Statement … of Transpower’s long-life assets – availability of the transmission grid and the length of outages on the … Deliver ≥95% of FY19 base capex plan (Spend basis) Works Planning RCP3 Planning Submit RCP3 Plan to ComCom in …
Annual Report 2018_19 FINAL compressed.pdf
(PDF 4.11 MB)
Last updated: 23 Aug 2019
Annual Report 2018_19 FINAL compressed.pdf
… Annual Report 2018/19 D.17 CONTENTS Corporate Governance Statement … of Transpower’s long-life assets – availability of the transmission grid and the length of outages on the … Deliver ≥95% of FY19 base capex plan (Spend basis) Works Planning RCP3 Planning Submit RCP3 Plan to ComCom in …
Annual Report 2018_19 FINAL compressed.pdf
(PDF 4.11 MB)
Last updated: 23 Aug 2019
Annual Report 2018_19 FINAL compressed.pdf
… Annual Report 2018/19 D.17 CONTENTS Corporate Governance Statement … of Transpower’s long-life assets – availability of the transmission grid and the length of outages on the … Deliver ≥95% of FY19 base capex plan (Spend basis) Works Planning RCP3 Planning Submit RCP3 Plan to ComCom in …
Annual Report 2018_19 FINAL compressed.pdf
(PDF 4.11 MB)
Last updated: 05 Jul 2024
System operator preliminary report - Northland loss of supply v1.pdf
… System operator preliminary report: Northland loss of supply This document outlines the … potential overloading of the Henderson_Maungatapere 110 kV transmission circuits. A grid emergency was declared at … (T130 on the Henderson-Marsden A double circuit 220 kV transmission line), auto-reclose was unsuccessful in … 15 Appendix B: Pre-event planning timeline …
Last updated: 21 Mar 2024
2024 Annual Outage Planning Forum.pdf
… Annual Outage Planning Forum 24/25 21 March 2024 ANNUAL OUTAGE FORUM 24/25 … relation to any assets • After an AVN is sent, designated Transmission Customers or Interested Participants can … • Deliver the in-scope content separately in standalone reports • Publish a 2-yearly summary report of risks to our …
2024 Annual Outage Planning Forum.pdf
(PDF 2.38 MB)
Last updated: 06 Jun 2018
Interconnection Asset Capacity and Grid Configuration Reports - November 2017.pdf
… asset capacity and grid configuration Annual Report 2016 - 2017 Pursuant to Electricity Industry … to publish and provide a written report to each designated transmission customer and to the Board on its compliance … policy TP GQ 45.01, which Transpower uses for outage planning purposes, reflects the requirements of the Outage …