Resources
Displaying 161 - 170 of 1206
Last updated: 05 Jun 2019
WUNIVM Power System Analysis Report - June 2019.pdf
… INVESTIGATION ATTACHMENT A: POWER SYSTEMS ANALYSIS REPORT Transpower New Zealand Limited June 2019 Table of … 26 5.1.6 Non-transmission solutions (NTS) … 33 6.2.1 Investment option 1 – Non-transmission solution (NTS) … This is our standard modelling technique used for grid planning purposes. 2 See …
WUNIVM Power System Analysis Report - June 2019.pdf
(PDF 1.4 MB)
Last updated: 13 Sep 2018
Monthly HVDC Utilisation Report August 2018.pdf
… MARKET MATTERS HVDC UTILISATION REPORT AUGUST 2018 HVDC Utilisation In late 2016 we … capacity. The key factors limiting utilisation are: a) Transmission constraints (including AC and DC constraints), … separation caused by either of the above 2 factors. a) Transmission constraints Transmission constraints limit the …
Monthly HVDC Utilisation Report August 2018.pdf
(PDF 1.11 MB)
Last updated: 17 Oct 2023
Monitoring Report - October 2023 - Final.pdf
… EMPOWERING OUR ENERGY FUTURE DRAFT IN PROGRESS Monitoring Report October 2023 WHAKAMANA I TE MAURI HIKO EMPOWERING OUR … Hiko series, visit https://www.transpower.co.nz/about- us/transmission-tomorrow The base case: Accelerated … 6 Ensuring generation meets peaks 2 Integrated system planning 7 Managing dry year risk 3 Getting the incentives …
Monitoring Report - October 2023 - Final.pdf
(PDF 4.86 MB)
Last updated: 25 Feb 2019
TP Sub MBIE technical report on process heat Feb 2019.pdf
… As outlined in Transpower’s Te Mauri Hiko – Energy Futures report, we agree with MBIE that electrification of process … electricity demand by 2050, the challenge of ensuring the transmission system can meet the needs of increasing demand … updates and additions. This would enable broader sector planning. There is a critical need to ensure the network …
TP Sub MBIE technical report on process heat Feb 2019.pdf
(PDF 571.16 KB)
Last updated: 02 Dec 2022
s53ZD_AssetHealthNetworkRisk_Expert Opinion Progress Review Report_25Nov2022 .pdf
… Expert Opinion Progress Review Report on Asset Health and Risk Modelling Transpower New … and corrosion code review and development as part of the transmission line insulators and conductors are assessed as … classes, and the opex profile; and Annual Transmission Planning Report that outlines the forward-looking expansion …
Last updated: 24 Apr 2023
Post per-event unplanned interruption report - Cyclone Gabrielle.pdf
… Copy to: [email protected]; Interruption Report: Hawkes Bay loss of supply – 14 February to 22 … circuits, and several Central North Island transmission circuits were lost initially. Then Redclyffe … we will seek to learn from the experience to inform future planning and event response. The results of our lessons …
Last updated: 17 May 2022
EY report CUWLP BBI May 22.pdf
… Transmission Pricing Methodology corroborative modelling and application consistency review Management summary report May 2022 Disclaimer Ernst & Young Limited (“Ernst & … of the consistency of Transpower’s application of the Transmission Pricing Methodology (“TPM”) with chapter 3 of …
EY report CUWLP BBI May 22.pdf
(PDF 207.78 KB)
Last updated: 22 Jun 2020
BOB-OTA MCP - Attachment C - Options and costing report.pdf
… MAJOR CAPEX PROJECT ATTACHMENT C: OPTIONS AND COSTING REPORT Transpower New Zealand Limited May 2020 Table of … 37 A.1 Effect on transmission charges ..................................... … project delivery procedures including governance oversight, planning, scheduling, contract management, cost management, …
Last updated: 31 Aug 2020
DER report overview Final - final.pdf
… costs in New Zealand Why have we commissioned this report? Our central role within industry enables us to see … Alternative to the traditional grid connected generation, transmission capacity, and distribution capacity Paid … is receiving resource adequacy payments for avoided cost of transmission, would also be able to benefit from selling …
DER report overview Final - final.pdf
(PDF 674.67 KB)
Last updated: 13 Apr 2018
Final Printed Interim Report 2017_18 28.02.18.pdf
… D.17 INTERIM REPORT 2017_18 IR CONTENTS 1 CHAIR AND CHIEF … interests of New Zealand electricity consumers. The future transmission grid and the wholesale electricity market need … 2015/16 through to 2019/20. We are well under way with the planning and preparation of our RCP3 submission, which will …
Final Printed Interim Report 2017_18 28.02.18.pdf
(PDF 2.56 MB)