Resources
Displaying 201 - 210 of 1206
Last updated: 15 Sep 2022
EY CUWLP management summary report 15 Sept 2022.pdf
… Transmission Pricing Methodology corroborative modelling and application consistency review Management summary report 15 September 2022 Disclaimer Ernst & Young Limited … of the consistency of Transpower’s application of the Transmission Pricing Methodology (“TPM”) with chapter 3 of …
EY CUWLP management summary report 15 Sept 2022.pdf
(PDF 147 KB)
Last updated: 26 Oct 2021
2021-10 ASA Final Report.pdf
… 28 4.2.5 Inter-Island Transmission … demand forecast used for transmission and strategic planning. Winter energy demand forecasts are shown in Figure … peaks. For more discussion refer to the cover note to this report. 2 Although our TCC No Peaking sensitivity does …
2021-10 ASA Final Report.pdf
(PDF 1.91 MB)
Last updated: 03 Jul 2023
SO full report - Hawkes Bay loss of supply.pdf
… System operator report: Hawke’s Bay loss of supply This document contains … 2.3 Context: Hawke’s Bay power system The Hawke’s Bay transmission system (known as grid zone 5) is depicted in … aerial inspection. A grid emergency was declared and planning for a partial restoration via the system operator’s …
SO full report - Hawkes Bay loss of supply.pdf
(PDF 2.07 MB)
Last updated: 26 Jun 2023
2023 SOSA - Final Report - Final Version.pdf
… Energy Margin (NZ-WEM); adequacy of generation and HVDC transmission capacity to meet expected national electricity … a minor increase in the demand forecast compared to that reported in the 2022 SOSA, largely due to information … margins. https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment …
2023 SOSA - Final Report - Final Version.pdf
(PDF 2.88 MB)
Last updated: 02 Sep 2024
system operator rolling outage plan.pdf
… of an immediate event is an unexpected outage of a major transmission line or generating plant. outage means a … specialist). (b) any other personnel responsible for reporting to the system operator on the specified … direction. (b) for developing events, the methodology for planning for disconnection of electricity (nine days out to …
system operator rolling outage plan.pdf
(PDF 203.49 KB)
Last updated: 02 Nov 2022
March 2022 Board Report (2).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 1 2.32 dansonb Typewritten text 11 Health, Safety & … The feedback will be incorporated into return to office planning. Worksafe Notifications Health, Safety & Wellbeing … which involved some plastic becoming entangled with a transmission line. This plastic was very close to the ground …
March 2022 Board Report (2).pdf
(PDF 1.21 MB)
Last updated: 02 Nov 2022
March 2022 Board Report.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 1 2.32 dansonb Typewritten text 11 Health, Safety & … The feedback will be incorporated into return to office planning. Worksafe Notifications Health, Safety & Wellbeing … which involved some plastic becoming entangled with a transmission line. This plastic was very close to the ground …
March 2022 Board Report.pdf
(PDF 1.21 MB)
Last updated: 03 May 2022
March 2022 Board Report.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 1 2.32 dansonb Typewritten text 11 Health, Safety & … The feedback will be incorporated into return to office planning. Worksafe Notifications Health, Safety & Wellbeing … which involved some plastic becoming entangled with a transmission line. This plastic was very close to the ground …
March 2022 Board Report.pdf
(PDF 1.21 MB)
Last updated: 03 Mar 2023
Transpower submission: Cost of Capital - Frontier Report (3 February 2023)
… Response to CEPA WACC report Report for Transpower New Zealand | 1 February 2023 2 … companies do not identify investments or put resources into planning for them, or because the finance to deliver those … that an investment of $42 billion across generation, transmission and distribution will be required before the …
Last updated: 18 Sep 2023
Health, Safety & Wellbeing Board Report July 2023.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 0 Actions Closed 4 Actions Raised 4 Total Actions … site specific run engineering specification. Following the ‘transmission lines best practice guide’, no one was located … site specific run engineering specification. Following the ‘transmission lines best practice guide’, no one was located …
Health, Safety & Wellbeing Board Report July 2023.pdf
(PDF 2.47 MB)