Last updated: 16 Sep 2022
August 2022 Health, Safety & Wellbeing Board Report.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 0 1 0 0 0 0 0 0 0 0 0 5 2 0 0 0 1 0 2 0 0 4 2.59 5.90 … progress on actions with service provider. Previous Interim transmission corridor, a worker became unattached completed … Competent People Fitness for Work Permits, Licences and… Planning Tools and equipment 1 44 18 20 51 42 Full Partial …
Last updated: 25 Feb 2025
Transpower - Post interruption report - Hawkes Bay LOS Lightning 21122024
… Copy to: [email protected]; Interruption Report: Hawke’s Bay Loss of Supply – 21 December 2024 At … to 2.395 system minutes. Transpower must publicly report for each unplanned interruption over one system … damage to the generation assets. 4 | P a g e Figure 1: Transmission system schematic. Clause 26.2.1 – the cause of …
Last updated: 12 Jan 2022
FINALAUDITED Transpower GHG Emissions Inventory Report FY2020.21.pdf
… Greenhouse Gas Emissions Inventory Report Transpower NZ Ltd Version: FINAL Inventory Period: 1 … 2) Electricity use in buildings and substations 808 Transmission losses 213,369 Subtotal: 214,177 Indirect … we need to take to give effect to this transition. In our planning, investment and operational functions, we work with …
Last updated: 26 Aug 2024
FY24 Greenhouse Gas Inventory Report FINAL.pdf
… Greenhouse Gas Emissions Inventory Report Transpower New Zealand Limited Version: Final … 187 Operational buildings 92 Electricity use total 279 Transmission losses Transmission losses 107,573 Scope 2 … we need to take to give effect to this transition. In our planning, investment, and operational functions, we work …
FY24 Greenhouse Gas Inventory Report FINAL.pdf
(PDF 1.3 MB)
Last updated: 12 Oct 2021
PBA Consulting 9 Aug 21 Grid Emergency Investigation Report.pdf
… Approved By: Robyn Armstrong – Chairman, PBA Consulting Report Number: JC-001-102 Final Report 6 October 2021 … the power lines that carry electricity from the national transmission grid to homes and businesses across New … could change in a few weeks whilst maintenance outage planning was carried out in a timeframe of several months. …
Last updated: 25 Feb 2022
Transpower_Interim Report 2122_SCREEN_FINAL.pdf
… Interim Report 2021/22 D .17 FINANCIAL STATEMENTS Six Months ended … area. Another area of focus has been the progression of the Transmission Pricing Methodology (TPM). Currently, the … ongoing supply chain and workforce challenges of COVID-19. Transmission revenue declined 8.2% to $414.8 million (2020: …
Transpower_Interim Report 2122_SCREEN_FINAL.pdf
(PDF 1.22 MB)
Last updated: 06 Apr 2023
Transpower Greenhouse Gas Inventory Report (2021-2022)
… Greenhouse Gas Emissions Inventory Report Transpower NZ Ltd Version: Final Inventory Period: 1 … 2) Electricity use in buildings and substations 391 Transmission losses 168,927 Subtotal: 169,318.37 Indirect … we need to take to give effect to this transition. In our planning, investment, and operational functions, we work …
FY22 Greenhouse Gas Inventory Report_FINAL.pdf
(PDF 827.99 KB)
Last updated: 21 Feb 2014
Waipori-PDA-External-Report.pdf
… 12 5 Transmission Losses … 22 8.4 New 110kV Transmission Line to Halfway Bush … Page 4 of 41 June2013 1 Introduction The objective of this report is to: "Confirm the feasibility of bypassing existing … under Transpower’s current prudent discount policy. This report examines the operation as it stands today and updates …
Waipori-PDA-External-Report.pdf
(PDF 2.37 MB)
Last updated: 16 Apr 2025
Health Safety and Wellbeing Report - March 2025
… Corrective Actions Status Workplan Delivery Assurance l Reporting l <6 Target Controls Checked 738 Month Worksafe … 2025 TP.HSW 01.13b Health, Safety and Wellbeing Performance Report Total Recordable Injury Frequency Rate | TRIFR … tower climb and 177155 - the aircraft flying under transmission lines) Power BI Desktop ID Incident Date …
Health Safety and Wellbeing Report - March 2025.pdf
(PDF 4.32 MB)
Last updated: 02 Oct 2024
Industry Exercise 2024 Report Final.pdf
… System Operator Report: Industry Exercise 2024 This document contains a … customers connected directly to the national electricity transmission grid. We also held workshops ahead of each … Assistant Operations • ELT IMT / Governance Liaison Planning • Real-time Liaison Logistics Intelligence PIM / …
Industry Exercise 2024 Report Final.pdf