Resources
Displaying 241 - 250 of 1206
Last updated: 06 Dec 2021
Published Annual Report 30112021.pdf
… asset capacity and grid configuration Annual Report 2020 - 2021 Pursuant to Electricity Industry … to digger operator to raise awareness of working around transmission lines. SS21033 OKN-NPK-ONG-1 B CCT 110 9.66 … and interested participant understanding of our Outage Planning processes and to improve transparency of Transpower …
Published Annual Report 30112021.pdf
(PDF 2.39 MB)
Last updated: 12 Oct 2021
PBA Consulting_9 Aug 21 Grid Emergency Investigation_Final Report.pdf
… Approved By: Robyn Armstrong – Chairman, PBA Consulting Report Number: JC-001-102 Final Report 6 October 2021 … the power lines that carry electricity from the national transmission grid to homes and businesses across New … could change in a few weeks whilst maintenance outage planning was carried out in a timeframe of several months. …
Last updated: 16 May 2018
Attachment B Options and Costing Report.pdf
… SECTION) RECONDUCTORING ATTACHMENT B: OPTIONS AND COSTING REPORT TRANSPOWER NEW ZEALAND LIMITED April 2018 OTERANGA … to the project fall into three broad categories: • Non-transmission solutions or alternatives to decrease or eliminate the need for a transmission investment through the use of such things as …
Attachment B Options and Costing Report.pdf
(PDF 1.02 MB)
Last updated: 16 May 2018
Attachment A Condition Assessment Report.pdf
… SECTION) RECONDUCTORING ATTACHMENT A: CONDITION ASSESSMENT REPORT Transpower New Zealand Limited February 2018 OTERANGA … Executive Summary The Oteranga Bay – Haywards A (OTB-HAY A) transmission line is presently strung with duplex conductor … provide a sufficient forward lookahead and to meet current planning timeframes. It is important to note that the Cormon …
Attachment A Condition Assessment Report.pdf
(PDF 1.1 MB)
Last updated: 28 Aug 2023
FY23 Greenhouse Gas Inventory Report.pdf
… Greenhouse Gas Emissions Inventory Report Transpower NZ Ltd Version: Final Inventory Period: 1 … 172 Operational buildings 77 Electricity use total 249 Transmission losses Transmission losses 111,323 Scope 2 … we need to take to give effect to this transition. In our planning, investment, and operational functions, we work …
FY23 Greenhouse Gas Inventory Report.pdf
(PDF 1.06 MB)
Last updated: 18 Dec 2023
Transpower - Post interruption report - MTI Bus C Sept 2023.pdf
… Copy to: [email protected]; Interruption Report: Maraetai Bus C – 24-25 September 2023 The Maraetai … The source of the fault was located on a bus tie line transmission tower; the tripping had been caused by … flashover was caused by bird streaming on a bus tie line transmission tower, from a heron’s nest located directly …
Transpower - Post interruption report - MTI Bus C Sept 2023.pdf
(PDF 220.64 KB)
Last updated: 08 Nov 2023
Transpower submission - MBIE Gas Transition Plan - November 2023.pdf
… This role includes inves ng, contrac ng and opera onal planning of: genera on capability (including the fuel it needs); demand-side resources; and transmission capability. Transpower, in its role as the … ves, provided there 4 See Transpower’s latest monitoring report here 4 Chapter 2: Transitioning our gas sector are …
Last updated: 01 Oct 2021
10.09.21 FINAL Transpower GHG Emissions Inventory Report FY2020.21.pdf
… Greenhouse Gas Emissions Inventory Report Transpower NZ Ltd Version: FINAL Inventory Period: 1 … 2) Electricity use in buildings and substations 808 Transmission losses 203,891 Subtotal: 204,699 Indirect … we need to take to give effect to this transition. In our planning, investment and operational functions, we work with …
Last updated: 29 Mar 2021
WiTMH Monitoring Report - March 2021.pdf
… EMPOWERING OUR ENERGY FUTURE DRAFT IN PROGRESS 1 Monitoring Report March 2021 WHAKAMANA I TE MAURI HIKO EMPOWERING OUR … Hiko series, visit https://www.transpower.co.nz/about- us/transmission-tomorrow The base case: Accelerated … advice likely to have an effect 2 Integrated system planning • Transpower has begun its ‘Net Zero Grid Pathways’ …
WiTMH Monitoring Report - March 2021.pdf
(PDF 1.59 MB)
Last updated: 29 Mar 2021
WiTMH Monitoring Report - March 2021.pdf
… EMPOWERING OUR ENERGY FUTURE DRAFT IN PROGRESS 1 Monitoring Report March 2021 WHAKAMANA I TE MAURI HIKO EMPOWERING OUR … Hiko series, visit https://www.transpower.co.nz/about- us/transmission-tomorrow The base case: Accelerated … advice likely to have an effect 2 Integrated system planning • Transpower has begun its ‘Net Zero Grid Pathways’ …
WiTMH Monitoring Report - March 2021.pdf
(PDF 1.59 MB)