2024 SOSA - Final Report - Final Version.pdf
… Margin (SI-WEM); adequacy of generation and north- to-south transmission capacity to meet expected South Island … decrease in the national demand forecast compared to that reported in the 2023 SOSA, largely attributed to a lower … MW for NI-WCM. https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment …
2024 SOSA - Final Report - Final Version.pdf
(PDF 3.91 MB)
Last updated: 05 Jul 2023
PR-OC-214 Publish a Planned Outage Co-ordination Procedure (POCP) Assessment.pdf
… 10 5.4.2 HVDC outages – Planning … been approved for publishing? Publish the assessment report to POCP 3 Yes Continue to monitor the situation after … effect of this constraint is to manage flows through all transmission lines into the upper North Island region for a …
Last updated: 03 Dec 2019
Draft Procurement Plan 2018 - For Consultation.pdf
… .............................. 141414 System operator reporting to the Authority (clause 8.43(g)) … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch … generation output that supports the initial charging of transmission circuits and assets, and the progressive …
Draft Procurement Plan 2018 - For Consultation.pdf
(PDF 583.05 KB)
Last updated: 10 Sep 2014
TP_Sub_Appendix_A_Frontier_Loss_Function_Report_29_Aug14.pdf
… of a loss function simulation model to New Zealand A REPORT PREPARED FOR TRANSPOWER August 2014 i Frontier … that the resulting WACC percentile would apply to both transmission and distribution networks, which leads to a … input assumptions peak demand forecast in its 2014 Annual Planning Report 32 as a proxy and assumed that new demand …
TP_Sub_Appendix_A_Frontier_Loss_Function_Report_29_Aug14.pdf
(PDF 835.66 KB)
Last updated: 16 Dec 2022
PBA Independent Review of HVDC Power Reduction Event 7 October 2022 - Final Report.pdf
… Approved By: Tony Armstrong – Director, PBA Consulting Report Number: JC-001-105 Final Report 16 November 2022 … responded by cancelling a number of planned generation and transmission outages so as to improve the resilience of the … Electronics System Operator Operations Manager Operations Planning Manager 3. Background to HVDC Operation 3.1. …
Last updated: 15 Apr 2024
Health Safety and Wellbeing Board Report March 2024.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 3 Actions Closed 1 Actions Raised Monitor FY 23/24 … Wednesday, 31 July 2024 APPR New action raised to assess transmission standard steel pole ‘winching lug’ viability … site specific run engineering specification. Following the ‘transmission lines best practice guide’, no one was located …
Health Safety and Wellbeing Board Report March 2024.pdf
(PDF 3.65 MB)
Last updated: 29 Jun 2022
2022 SOSA - Final Report - Final Version.pdf
… 44 4.2.6 Inter-Island Transmission Assumptions … demand forecast aligned with transmission and strategic planning (e.g. Whakamana i Te Mauri Hiko), the Electricity … and demand, as highlighted in our Weekly Market Movements report (Market Operations - Weekly Market Movements - 28 …
2022 SOSA - Final Report - Final Version.pdf
(PDF 4.37 MB)
Last updated: 13 Sep 2024
Health Safety Wellbeing Board Report August 2024.pdf
… Corrective Actions Status Workplan Delivery Assurance l Reporting l <6 Target Controls Checked 755 Worksafe … activities were pivoted and focused on People (competency), Planning for the work (including procedures) and Supervision … site specific run engineering specification. Following the ‘transmission lines best practice guide’, no one was located …
Health Safety Wellbeing Board Report August 2024.pdf
(PDF 3.25 MB)
Last updated: 15 Dec 2020
Trustpower submission on TPM Options Consultation - Attachment 2 - JC 2020 Report - Example_UpperWaitaki_FINAL.pdf
… this worked example 8 Dec 2020 John Culy JC2JC2Introduction Report to TrustPower - 8 December 2020 2 o TrustPower … for the current Clutha Upper Waitaki Lines Project. o This transmission project is relatively simple and straight … schemes that is likely with Tiwai exit and without the transmission investment. The major uncertainty relates to …
Last updated: 02 Aug 2021
Procurement Plan 2022 - Marked Up.pdf
… 8.43(f) of the Code) ................... 14 System operator reporting to the Authority (clause 8.43(g) of the Code) … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch … generation output that supports the initial charging of transmission circuits and assets, and the progressive …
Procurement Plan 2022 - Marked Up.pdf
(PDF 608.25 KB)