Resources
Displaying 361 - 370 of 1206
Last updated: 30 Sep 2021
Transpower_IR20-21_FINAL_.pdf
… D .17 Integrated Report 2020/21 Empowering our energy future We empower the … of the materiality assessment used to inform our planning, how we are creating value while taking into … owner and operator of New Zealand’s national electricity transmission system, Transpower holds a unique position in …
Transpower_IR20-21_FINAL_.pdf
(PDF 10.55 MB)
Last updated: 19 Dec 2016
Service Performance Measures Feedback Summary December 2016.pdf
… Federated Farmers noted that it makes little sense to report against measures that only describe whether something … which affects the response time for distributors for sub-transmission faults. This in turn affects the interruption … connections in particular, service targets driving grid planning would be useful. Voltage disturbances MEUG note …
Last updated: 30 Jun 2022
Transpower SCI_202223 Final 30 06 22.pdf
… 5 2.11 Transmission Services … • Deliver and operate a safe, reliable, cost- efficient transmission grid that meets New Zealand’s needs now and … when intervention is likely to be required. We measure and report the AHI for six asset classes. Two classes (power … 1 at the end of FY 24 as well as annual sustainability reporting. This will demonstrate our climate change …
Transpower SCI_202223 Final 30 06 22.pdf
(PDF 2.63 MB)
Last updated: 30 Jun 2022
Transpower SCI_202223 Final 30 06 22.pdf
… 5 2.11 Transmission Services … • Deliver and operate a safe, reliable, cost- efficient transmission grid that meets New Zealand’s needs now and … when intervention is likely to be required. We measure and report the AHI for six asset classes. Two classes (power … 1 at the end of FY 24 as well as annual sustainability reporting. This will demonstrate our climate change …
Transpower SCI_202223 Final 30 06 22.pdf
(PDF 2.63 MB)
Last updated: 23 Dec 2013
TP ID sub.pdf
… and the annual disclosures we make in our Annual Regulatory Report (ARR). In many cases, the proposed ID requirements … price-quality path (IPP) regulation that applies to our transmission business. This chapter introduces the approach … network to the wholesale electricity market, and various planning and technical standards. These arrangements include …
TP ID sub.pdf
(PDF 1.12 MB)
Last updated: 08 Jun 2022
FINAL - Investor Presentation - May 2022.pdf
… issued by Transpower 6 7 • Over $4.9 billion regulated transmission assets • Sole Transmission System Operator in New Zealand • Approximately … Statements December 2021 and Transpower’s Transmission Planning Report 2021 …
FINAL - Investor Presentation - May 2022.pdf
(PDF 3.24 MB)
Last updated: 01 May 2020
Cover note for 2020 Security of Supply Annual Assessment AS PUBLISHED.pdf
… are comparatively lower than those used in the draft report. • We have updated our assumptions concerning Mercury … Gas Turbines shuts down in 2023. • For the change in peak transmission pricing sensitivity we have aligned the assumed … increase in winter peak demand to a recently published report by Concept Consulting. • We have included a …
Last updated: 16 Jan 2024
Credible Event Review - Scope 2024.pdf
… 2024 December 2023 Version Date Change 1 14/12/2023 Initial Report 2 IMPORTANT Disclaimer The information in this … 18 7.3 Transmission … 19 7.4 Double Circuits Transmission Line … means that if real-time conditions are different from our planning studies some security issues may go undetected. …
Credible Event Review - Scope 2024.pdf
(PDF 1.85 MB)
Last updated: 09 Feb 2018
aee.pdf
… of Effects on the Environment: Realignment of the HAI-MTM-A Transmission Line, Maungatapu to Matapihi including … by Matthew Curran, Transpower Signature Limitations: The report has been prepared for Transpower, according to their … 117) is assessed as a permitted activity under the relevant planning documents and accordingly these properties are not …
aee.pdf
(PDF 1.22 MB)
Last updated: 18 Oct 2019
Annual Review 2018-19 FINAL.pdf
… US CREATING VALUE CONTENTS Our Year In Review 01 Chair’s Report 02 Chief Executive’s Report 04 Year at a Glance 07 … transition to becoming a net zero-carbon economy. Careful planning, coordination and a commitment to innovation is key … of $1,084.4 million. This was primarily driven by lower transmission revenue which dropped around five per cent from …
Annual Review 2018-19 FINAL.pdf
(PDF 11.14 MB)