Resources
Displaying 381 - 390 of 1206
Last updated: 27 Nov 2019
CAP Newsletter August 2019.pdf
… panel’s advice and insights to better inform its business planning and decision making. We believe that through … Change Commission’s (ICCC) Accelerated Electrification report and Transpower’s own Process Heat report. The ICCC … following feedback and a review of the work programme. 4. Transmission pricing and Transmission Pricing Review: …
CAP Newsletter August 2019.pdf
(PDF 154.15 KB)
Last updated: 28 Jan 2019
Transpower cross submission to Commerce Commission RCP3 process.pdf
… process comprised: • tripartite meetings; • draft and final reports shared with the Commission and Transpower; and • a … Clarifying the impact of transmission on residential electricity prices Any … this proposal (and in more detail in our 2018 Transmission Planning Report), will not be materially affected by Te …
Last updated: 21 Jan 2025
Market Operations - Weekly Report - 19 January 2025
… Power BI Desktop Market Operations Weekly Report - Week Ended 19 January 2025 TRANSPOWER // MARKET … more closely through the market schedules. The latest NZGB report is available on the NZGB website. Electricity Market … hydro storage, reduced wind, and some central North Island transmission outages. Hydro generation contributed 61%, wind …
Market Operations - Weekly Report - 19 January 2025.pdf
(PDF 2.59 MB)
Last updated: 28 Aug 2023
Notice of Intention - Upper South Island Apr5 2023.pdf
… on our latest demand forecasts (as outlined in the 2022 Transmission Planning Report),1 we have identified that the supply into the USI …
Notice of Intention - Upper South Island Apr5 2023.pdf
(PDF 236.91 KB)
Last updated: 14 Aug 2024
August 2024 customer webinar slides.pdf
… Release Boundary here • Access security of supply daily reporting on Transpower website here • To join our System … enquiries to connect to Transpower is strong Investment in transmission is required to meet this growth, while … increased from 50-60% to 70-80% o System / network planning o Managing unplanned outages o Completion of …
August 2024 customer webinar slides.pdf
(PDF 6.81 MB)
Last updated: 14 Jun 2022
20220603 Managed Retreat and draft NAP submission (final).pdf
… is the owner and operator of New Zealand’s electricity transmission network, the National Grid1. The Grid is … Defence Emergency Management Act 2002. 2. We are a Climate Reporting Entity under the Climate Change Response Act (Zero … Natural and Built Environments Act (NBA), Strategic Planning Act (SPA), Climate Adaptation Act (CAA) and the …
20220603 Managed Retreat and draft NAP submission (final).pdf
(PDF 400.74 KB)
Last updated: 29 Mar 2021
FINAL - DOMESTIC BOND Investor Presentation.pdf
… throughout different levels of lockdown with extensive re-planning of the project portfolio and related outages • … Impact of COVID-19 Pandemic 9 • Over $4.8 billion regulated transmission assets • Sole Transmission System Operator … Statements June 2020 and Transpower’s Transmission Planning Report 2020 …
FINAL - DOMESTIC BOND Investor Presentation.pdf
(PDF 2.82 MB)
Last updated: 29 Mar 2021
FINAL - DOMESTIC BOND Investor Presentation.pdf
… throughout different levels of lockdown with extensive re-planning of the project portfolio and related outages • … Impact of COVID-19 Pandemic 9 • Over $4.8 billion regulated transmission assets • Sole Transmission System Operator … Statements June 2020 and Transpower’s Transmission Planning Report 2020 …
FINAL - DOMESTIC BOND Investor Presentation.pdf
(PDF 2.82 MB)
Last updated: 23 Apr 2021
HSW 01.06.pdf
… These assets include any facilities and equipment for transmission of electrical energy between identified grid … for Transpower Work Standard TP.HSW 01.03 Incident Reporting, Classification, Investigation and Analysis … public or significant damage to public property during work planning activities, and ensure appropriate controls are …
HSW 01.06.pdf
(PDF 278.83 KB)
Last updated: 29 Sep 2017
TP_Sub_Capex_IM_Incentive_Mechanisms_22Sept2017.pdf
… scheme for major and listed projects 2. engagement, transmission alternatives and scrutiny under base capex 3. … and technology development are changing the context for planning major capex expenditure and managing risk. In our … projects (E&D) less than $20m. Our transmission planning report (TPR)5 indicates areas of the grid where capacity and …
TP_Sub_Capex_IM_Incentive_Mechanisms_22Sept2017.pdf
(PDF 1.22 MB)