Resources
Displaying 391 - 400 of 1206
Last updated: 27 Apr 2022
TP_Sub_Targeted_Review_ID_20April2022.pdf
… time) ID requirements with period-specific price-quality reporting requirements, by replacing prescription in the ID … For a longer-term view, Transpower already publishes its Transmission Planning Report2 (TPR) as the main vehicle for identifying …
TP_Sub_Targeted_Review_ID_20April2022.pdf
(PDF 215.87 KB)
Last updated: 08 Oct 2018
Transpower Final Annual Review 2017 18.pdf
… a new Energy Future Contents Our Year in Review 1 Chair's Report 2 Chief Executive's Report 5 Year at a Glance 8 About … last 12 months, we have led a major research and scenario planning exercise, Te Mauri Hiko – Energy Futures to better … grid to ensure we have a modern, robust electricity transmission system to “Towards a safe, secure and …
Transpower Final Annual Review 2017 18.pdf
(PDF 5.48 MB)
Last updated: 08 Jun 2012
compliance-statement-30-jun-2007.pdf
… SERVICES 34 SCHEDULE 6 36 STANDARD SPECIFICATIONS: REPORTING BY CONTRACTORS 36 SCHEDULE 7 38 STANDARD … are not directly related to the provision of electricity transmission; and c. demonstrates that it has not complied … to consumers are those set out in Transpower’s: a. Annual Planning Report; b. Asset Management Plan; c. connections …
compliance-statement-30-jun-2007.pdf
(PDF 1.72 MB)
Last updated: 29 Sep 2020
TCC-workshop-pre-reading-2018-Grid-Owner-case-studies-relating-to-RCPD-removal.pdf
… page C1 Attachment C Impact of removing peak pricing on transmission investment Transpower as the Grid Owner, … other issues identified in our 15-year ahead Transmission Planning Report (TPR); and Advancing grid issues that are outside …
Last updated: 29 Sep 2020
TCC-workshop-pre-reading-2018-case-studies.pdf
… page C1 Attachment C Impact of removing peak pricing on transmission investment Transpower as the Grid Owner, … other issues identified in our 15-year ahead Transmission Planning Report (TPR); and Advancing grid issues that are outside …
TCC-workshop-pre-reading-2018-case-studies.pdf
(PDF 147.84 KB)
Last updated: 20 Dec 2024
WBoP - Attachment 1 - Compliance with the Capex IM
… investment need to be met, which may be either or both, a transmission investment or non-transmission solution; … of the investment need with our latest Transmission Planning Report (2023). The Transmission Planning Report is part of …
WBoP - Attachment 1 - Compliance with the Capex IM.pdf
(PDF 840.03 KB)
Last updated: 08 Jun 2012
third-threshold-compliance-statement-aug-05.pdf
… SERVICES SCHEDULE 6 30 STANDARD SPECIFICATIONS: REPORTING BY CONTRACTORS SCHEDULE 7 32 STANDARD … are not directly related to the provision of electricity transmission; and c. demonstrates that it has complied with … these service quality demands in its asset management planning. 27. For the purposes of compliance with the 2003 …
third-threshold-compliance-statement-aug-05.pdf
(PDF 1.13 MB)
Last updated: 14 Dec 2017
TP_Sub_Capex_IM_Draft_Decisions_12Dec2017.pdf
… comparison’ to CC 24 November 2107 6 Via grid reliability report 12.114 and GRS, and grid economic investment report … for our RCP3 proposal as described in our July 2017 Transmission Planning Report. 11 In Appendix A we evaluate the Commission …
TP_Sub_Capex_IM_Draft_Decisions_12Dec2017.pdf
(PDF 966.08 KB)
Last updated: 04 Jul 2017
Chapter 3 - Investment Uncertainties 2017 - FINAL.pdf
… Chapter 3: Investment Uncertainties 2017 Transmission Planning Report © Transpower New Zealand Limited 2017. All rights …
Chapter 3 - Investment Uncertainties 2017 - FINAL.pdf
(PDF 138.88 KB)
Last updated: 03 Mar 2025
TP_WACC_Attach_C_Castalia_Rational Regulated Response
… Advisory Group. The Rational Response of a Regulated Transmission Company to a Low WACC Report to Transpower 1 May 2014 Confidential Acronyms and … GRS to its network. The GRS rely on forecasts that reflect planning, judgement and attitudes towards risk. Changing …
TP_WACC_Attach_C_Castalia_Rational Regulated Response.pdf
(PDF 693.34 KB)