Net Zero Grid Pathways 1 major capex proposal.pdf
… 35 2.4.5 Transmission outages … 38 3.3 Treatment of non-transmission solutions … these investments as a package enables forward work planning to ensure timely delivery, and allows Transpower to … face. As detailed in the recent The Future is Electric report from Boston Consulting Group: “This will require …
Net Zero Grid Pathways 1 major capex proposal.pdf
(PDF 1.62 MB)
Last updated: 23 Sep 2022
Transpower RCP4 Consultation.pdf
… 34 2.4.2 Workforce planning and deliverability … 58 3.5 Transmission lines … 82 3.11.1 Transmission pricing methodology … document is on what we should include or exclude in our planning for this period and beyond, rather than on the … until the end of RCP6. The 2022 Transmission Planning Report covers our forecast needs for the next 15 years. …
Transpower RCP4 Consultation.pdf
(PDF 12.83 MB)
Last updated: 23 Sep 2022
Transpower RCP4 Consultation.pdf
… 34 2.4.2 Workforce planning and deliverability … 58 3.5 Transmission lines … 82 3.11.1 Transmission pricing methodology … document is on what we should include or exclude in our planning for this period and beyond, rather than on the … until the end of RCP6. The 2022 Transmission Planning Report covers our forecast needs for the next 15 years. …
Transpower RCP4 Consultation.pdf
(PDF 12.83 MB)
Last updated: 06 Dec 2022
RCP4 Consultation Summary of Feedback
… 4 2.4 Transmission Pricing Methodology … As per one submitters request, we will publish the final report from our Independent Verifier when we receive it. … limit. 2.8 Investment approach Electra supports proactive planning for the electrification of both transport and …
RCP4 Consultation Summary December 2022.pdf
(PDF 566.17 KB)
Last updated: 01 Jul 2024
Transpower Statement of Corporate Intent (2024-25)
… 9 2.11 Transmission Services … • Deliver and operate a safe, reliable, cost-efficient transmission grid that meets New Zealand’s needs now and … when intervention is likely to be required. We measure and report the AHI for six asset classes. Two classes (power … design opportunities. We will also deliver climate reporting to Aotearoa New Zealand Climate Reporting …
Transpower 2024 25 SCI Final.pdf
(PDF 1.75 MB)
Last updated: 18 Oct 2024
HVDC Single Pole Risk Classification.pdf
… of 2023 we published the 2024 Credible Event Review Scope report signalling which events we would study during the … of this report. The HVDC link is a major part of the transmission system which enables the transport of … possible upgrades to the HVDC link in the 2023 Transmission Planning Report3. Stage 1 involves installing a second …
HVDC Single Pole Risk Classification.pdf
(PDF 624.25 KB)
Last updated: 07 Sep 2022
Domestic green bond investor presentation Sep 22.pdf
… issued by Transpower 7 8 • Over $4.9 billion regulated transmission assets • Sole Transmission System Operator in New Zealand • Approximately … Statements 30 June 2022 and Transpower’s Transmission Planning Report 2021 …
Domestic green bond investor presentation Sep 22.pdf
(PDF 3.13 MB)
Last updated: 23 Jun 2021
SO Annual Self-Review and Assessment 2019-2020.pdf
… 16 2.4 Planning for the future … processes, in this regard. These include additional advance reporting on likely generation balance margins during major … impact this year. The flood led to extensive damage to nine transmission towers on the Islington-Livingstone section of …
SO Annual Self-Review and Assessment 2019-2020.pdf
(PDF 2.11 MB)
Last updated: 21 Aug 2014
TP_Sub_IPP_RCP2_110714.pdf
… Dear Brett Submission on proposed IPP and compliance reporting We appreciate the opportunity to comment on the … the Electricity Authority on our adherence to the codified transmission pricing methodology. At worst, the obligation … These have been identified through a review of our internal planning cycle that aims to achieve a streamlined and …
TP_Sub_IPP_RCP2_110714.pdf
(PDF 510.73 KB)
Last updated: 21 Dec 2016
Combined Feedback.pdf
… concern to FFNZ members. This has however been in relation Transmission Pricing Methodology proposals put forward by … than outcomes. More precisely, it makes little sense to report against measures that only describe whether something … of using service targets as a primary driver for grid planning and the degree of ambition we should have in this …
Combined Feedback.pdf
(PDF 1.61 MB)