Resources
Displaying 481 - 490 of 1206
Last updated: 01 Apr 2020
TP Whakamana i Te Mauri Hiko.pdf
… the changes required to deliver it. The release of this report has been well and truly overtaken by the rapid spread … OUR CONNECTIONS PROCESS 51 2. INTEGRATED SYSTEM PLANNING 53 3. GETTING THE INCENTIVES RIGHT FOR … and a wide range of industry stakeholders. We consulted transmission operators in other parts of the world from whom …
TP Whakamana i Te Mauri Hiko.pdf
(PDF 7.93 MB)
Last updated: 23 Sep 2021
SO Annual Review 2020-21.pdf
… 11 1.5 Outage planning and co-ordination … of 9 August 2021. While the event falls outside the reporting period for this review, it was a significant event … generation outages, distribution load shifting and transmission outages in the area and provided options and …
SO Annual Review 2020-21.pdf
(PDF 1.94 MB)
Last updated: 05 Oct 2020
Asset-Health-and-Network-Risk-An-industry-review-for-Transpower-NZ.pdf
… with respect to or in connection with the attached report or any part thereof; and will have no liability to … and modelling. The adoption of more sophisticated asset planning approaches is enabling utilities to optimise where … by Ofgem in the UK which define performance measures for Transmission Operators and their calculation methodology. …
Last updated: 27 Nov 2023
s53ZD_Cost_Estimation_CC_28November2023.pdf
… 1. The information sought under the s53ZD notice1 via this report is assist the Commission to: • investigate and assess … $m Variance ($m, %) Actual/FEC against DBC Wairakei Ring transmission capacity - Build - Reactor 10.0 TPR 2018 … Power’s new zone substation at Bombay avoided a work planning clash and allowed for simpler implementation at the …
s53ZD_Cost_Estimation_CC_28November2023.pdf
(PDF 530.85 KB)
Last updated: 07 Aug 2024
Final - Orion Submission - Evolving market resource coordination in Aotearoa New Zealand.pdf
… data exchange for DER, ancillary services, outage planning, and the challenges posed by emerging technologies … a more holistic view of system coordination that spans both transmission and distribution networks. Q2. Do you agree … consumer behaviour survey 20233 and the Resi-Flex Public Report (The Consumer and Stakeholder Lens, 2023)4 to inform …
Last updated: 07 Sep 2022
RCP4 Webinar August 2022 - Material Portfolios
… Planning for RCP4 – Material Portfolios RCP4 Customer … equipment in place to enable rapid restoration of HVDC transmission service following failure • Maintain necessary … in RCP4 is outlined in our 2022 Transmission Planning Report. • We have seen a large increase in customer supplied …
Presentation from RCP4 webinar held in August 2022
(PDF 3.79 MB)

Last updated: 09 Aug 2022
RCP4 webinar August 2022 - Material Portfolios, E&D, TransGO.pdf
… Planning for RCP4 – Material Portfolios RCP4 Customer … equipment in place to enable rapid restoration of HVDC transmission service following failure • Maintain necessary … in RCP4 is outlined in our 2022 Transmission Planning Report. • We have seen a large increase in customer supplied …
Last updated: 09 Aug 2016
TP_TPM_Appendix_D_PWC_TPM_Impact_Assessment_26July2106.pdf
… to the Electricity Authority's consultation papers - A report for Transpower July 2016 www.pwc.co.nz PwC Jeremy … 21 July 2016 Dear Jeremy Review of the impact of the Transmission Pricing Methodology (TPM) changes In accordance … 0 Reporting and billing 0.1 0.1 Metering 0.5 0.5 System planning 0 Total 0.25 1.75 0.25 0 0.5 0.75 2 5.5 16 July …
Last updated: 16 Jul 2024
TP_Cross_Sub_RCP4_draft_decision_15July2024.pdf
… a return on investment. 5 The Commission requires us to report our return on investment as part of its Information … 2 Integrated planning 6 The Consumer Advocacy Council view is that … practice planning required an integrated approach between transmission and distribution. We agree with Consumer …
TP_Cross_Sub_RCP4_draft_decision_15July2024.pdf
(PDF 340.85 KB)
Last updated: 01 Mar 2019
RCP3 issues paper - submission - February 2019 (003).pdf
… what we learn through the engagement process back into our planning and decision-making. Our key engagement initiatives … years have been: • Engagement on strategic issues – our Transmission Tomorrow, Auckland Strategy and Te Mauri Hiko … and well developed (page 124, Independent Verification report). It found that our present practice with respect to …
RCP3 issues paper - submission - February 2019 (003).pdf
(PDF 1.41 MB)