Resources
Displaying 491 - 500 of 1206
Last updated: 08 Dec 2022
Benchmark Agreement.pdf
… AGREEMENT TRANSPOWER NEW ZEALAND LIMITED and [DESIGNATED TRANSMISSION CUSTOMER] Electricity Industry Participation … 47 35. DEFINITIONS 47 36. SERVICE STANDARDS 49 37. REPORTING 50 38. COMPLIANCE WITH LAWS, RULES AND STANDARDS … on the Customer to provide information to facilitate system planning, as set out in rule 3 of section III of part F of …
Benchmark Agreement.pdf
(PDF 501.48 KB)
Last updated: 28 Aug 2023
USI2 - Attachment 1 - Overview of need.pdf
… 11 2.2 Relationship with the Transmission Pricing Methodology … MCP, 13 February 2013. 5 This review reflected our general planning approach of regularly reviewing demand forecasts … Our planning studies that support our Transmission Planning Report9 (TPR) regularly review voltage support needs for the …
USI2 - Attachment 1 - Overview of need.pdf
(PDF 959.83 KB)
Last updated: 18 Dec 2024
USI - Attachment 1 - Need for Investment Demand and Generation Scenarios
… | December 2024 2 Figure 1: Upper South Island 220 kV transmission network 1.1.1 Prior investigations and … MCP, 13 February 2013. 5 This review reflected our general planning approach of regularly reviewing demand forecasts … Our planning studies that support our Transmission Planning Report9 (TPR) regularly assess the needs of the national …
Last updated: 30 Apr 2024
Fast-track Approvals Bill (final submission)
… will enable us to more rapidly provide the necessary transmission infrastructure to support New Zealand’s … are commonplace and have been built into legislation and planning policy for many years. If an exception is provided … is no timeframe for the responsible agency to prepare the report under clause 13. The Ministers’ decisions do not have …
Last updated: 23 Jul 2019
CAP slides - ComCom draft decision on RCP3 .pdf
… will allow us to recover from customers for electricity transmission services in 2020-2025 (the five years of RPC3) … how often the grid is available (security of supply) 4. Reporting obligations: information that we will produce 1 . … replacing overhead wires, as we enter a wave of replacing transmission lines built from the 1950’s to 1980’s. We have …
CAP slides - ComCom draft decision on RCP3 .pdf
(PDF 118.66 KB)
Last updated: 23 May 2024
NZGP1.1 Additional Modelling Information.pdf
… 3 3.1 AC grid transmission constraints … 4 4.0 BBI allocation transmission constraints … 1, Additional Modelling Information 1 1.0 Introduction This report provides additional modelling information to … here. 2 See Figure 11, Attachment D: Scenario and Modelling Report, NZGP 1, Major Capex Project 3 Also see Section 2.4.2 …
NZGP1.1 Additional Modelling Information.pdf
(PDF 449.58 KB)
Last updated: 07 Sep 2016
2016 AMP 7Sept'16.pdf
… PLAN 2016 A SUPPORTING DOCUMENT TO OUR 2016 INTEGRATED TRANSMISSION PLAN Asset Management Plan August 2016 II TABLE … 19 3.1. Planning … AMP is one of three supporting documents for our Integrated Transmission Plan (ITP), which collectively describes our … grid. The other two supporting documents are the Services Report and the Transmission Planning Report (TPR). The …
2016 AMP 7Sept'16.pdf
(PDF 1.67 MB)
Last updated: 19 Aug 2022
Nova submission on NZGP1 Stage 1 shortlist.pdf
… options for the grid backbone. As is acknowledged in the report, the methodology employed to weigh up the list of … to quantifying the resilience benefits of diverse transmission routes and risks due to natural disasters”. In … uncertainties that are difficult to incorporate into planning. Nova suggests that Real Options Analysis might be …
Nova submission on NZGP1 Stage 1 shortlist.pdf
(PDF 256.62 KB)
Last updated: 21 Aug 2014
TP_Sub_IPP_Mark_Up_Draft_Det_110714.pdf
… 17 PART 5: COMPLIANCE AND INFORMATION REPORTING … year, any customer from whom Transpower receives HVAC transmission revenue in the relevant pricing year HVAC … revenue means, in relation to a disclosure year, the HVAC transmission revenue for the relevant pricing year less …
TP_Sub_IPP_Mark_Up_Draft_Det_110714.pdf
(PDF 1.34 MB)
Last updated: 01 Nov 2019
Letter from Axiom and farrierswier (18 October 2019).pdf
… response to the Electricity Authority’s (Authority’s) third transmission pricing methodology (TPM) issues paper (the … Paper) cause us to revise the conclusions we set out in our report in relation to the quantitative cost-benefit analysis … signals that reflected a rudimentary measure of the LRMC of transmission; and ▪ the results of the grid use model could …
Letter from Axiom and farrierswier (18 October 2019).pdf
(PDF 212.84 KB)