Resources
Displaying 511 - 520 of 1206
Last updated: 15 Jan 2019
Grid Capability and Configuration.pdf
… asset capacity and grid configuration Annual Report 2017 - 2018 Pursuant to Electricity Industry … the hazards with operating large irrigation system near our transmission lines. 123 12-FEB-2018: OAM-BPT-WTK-1 tripped, … the hazards with operating large irrigation system near our transmission lines. 124 OAM-STU-BPD-WTK-2 B CCT 110 1.28 … Draft Outage Planning Policy …
Grid Capability and Configuration.pdf
(PDF 3.08 MB)
Last updated: 02 Jul 2024
SO Industry Forum 2 July 2024.pdf
… from SO: • Avoid scheduling outages (generation/transmission that constrain off generation) on days with low … this week • Our System Operator preliminary fact-based report on the 20 June loss of supply to Northland will be … https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment …
SO Industry Forum 2 July 2024.pdf
(PDF 3.21 MB)
Last updated: 22 Oct 2020
IEGA feedback on TPM Transitional Congestion Charge.pdf
… information outlines a case for a peak charge to remain in transmission charging. While this information reflects the … ssets/21/21136TP-TPM-Appendix-E-Scientia-Analysis-AoB-method-Report- 26July2016.pdf 2 participants currently combine to … 5 years and is it prudent for Transpower to not start planning to make that investment. For example, if a 5% …
IEGA feedback on TPM Transitional Congestion Charge.pdf
(PDF 980.3 KB)
Last updated: 02 Dec 2022
s53ZD_Customer_Consultation_CUWLP_Post Project Review_28Nov2022.pdf
… please contact: Name Stephen J Jones Position System Planning and Investment Manager Phone +64 4 590 7155 Email … Lines Project (CUWLP) upgrades to increase electricity transmission capacity between Roxburgh and the Waitaki … for Post-Investment Reviews and Post-Project Reviews This report addresses the requirements relating to …
Last updated: 04 Nov 2024
Xatech International Pty Ltd response to Transpower.pdf
… Plenty Development Plan Major Capex Short List Consultation Report dated July 2024. As indicated in the report we note … through increased amperage without the need for addition transmission line construction including an opportunity to … to be of assistance to Transpower for this and future HV Transmission projects. Kind regards Xatech International Pty …
Xatech International Pty Ltd response to Transpower.pdf
(PDF 2.44 MB)
Last updated: 02 Nov 2022
August 2021 (1).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 2 / Health, Safety & Wellbeing | Health & Safety … when it was pressurised, narrowly missing an energised 33Kv transmission line. There were two recordable injuries … generator capability. This reduce likely hood of switching planning failures especially during high workloads. Service …
August 2021 (1).pdf
(PDF 805.75 KB)
Last updated: 02 Nov 2022
August 2021.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 2 / Health, Safety & Wellbeing | Health & Safety … when it was pressurised, narrowly missing an energised 33Kv transmission line. There were two recordable injuries … generator capability. This reduce likely hood of switching planning failures especially during high workloads. Service …
August 2021.pdf
(PDF 805.75 KB)
Last updated: 11 Jul 2017
TPMsub_OpRev2_ItC_Trustpower_10Jul17.pdf
… Transpower should undertake an operational review of the transmission pricing methodology” (the Consultation Paper). … acquaintance with its own costs.” He also notes in his report that in the case of the regulation of a monopoly … Thus, stability for the purposes of structural financial planning or the design of infrastructures, is long term in …
TPMsub_OpRev2_ItC_Trustpower_10Jul17.pdf
(PDF 1009.35 KB)
Last updated: 23 Sep 2022
Grid Service Measures Engagement Paper 2 (Annex).pdf
… 13 7.2. GP-M – momentary interruptions reporting … used throughout this paper are described in the Integrated Transmission Plan Glossary. Grid Service Measures Engagement … lost load and forecast load based on our 2022 Transmission Planning Report8. In defining the boundaries of ‘High’ and …
Grid Service Measures Engagement Paper 2 (Annex).pdf
(PDF 1.84 MB)
Last updated: 23 Sep 2022
Grid Service Measures Engagement Paper 2 (Annex).pdf
… 13 7.2. GP-M – momentary interruptions reporting … used throughout this paper are described in the Integrated Transmission Plan Glossary. Grid Service Measures Engagement … lost load and forecast load based on our 2022 Transmission Planning Report8. In defining the boundaries of ‘High’ and …
Grid Service Measures Engagement Paper 2 (Annex).pdf
(PDF 1.84 MB)