Resources
Displaying 131 - 140 of 148
Last updated: 03 Sep 2021
Transmission Planning Report 2021.pdf
… Transmission Planning Report 2021 Chapter 1: Introduction 2021 Transmission Planning Report © … across New Zealand. Transmission Tomorrow is informed by Whakamana i Te Mauri Hiko – Empowering our Energy Future 3 …
Transmission Planning Report 2021.pdf
(PDF 7.91 MB)
Last updated: 22 Oct 2020
ALL TCC Feedback received.pdf
… 21 October 2020 Transpower Ltd PO Box 1021 Wellington 6140. By email to [email protected] Re: Feedback … provide feedback on the TCC workshop on 6 October that I attended on behalf of ENA members. Overall, the workshop would … require significant investment as identified Transpower’s Whakamana i Te Mauri Hiko Report 4 and other recent studies …
ALL TCC Feedback received.pdf
(PDF 4.77 MB)
Last updated: 27 Sep 2022
2022 Asset Management Plan.pdf
… Asset Management Plan 2022 Managing and maintaining our grid, ICT and Business Support assets September 2022 Asset Management Plan 2022 Transpower New … and lower carbon sources of generation. Our purpose, Whakamana i te mauri hiko tu mai Aotearoa – empowering the …
2022 Asset Management Plan.pdf
(PDF 11.99 MB)
Last updated: 06 Nov 2024
Presentation - 2024 System Operator Asset Owner Engineering Forum.pdf
… POWERING NEW ZEALAND TODAY + TOMORROW ASSET OWNER ENGINEERING FORUM 2024 1 2 Whakamana i te mauri hiko tū mai Aotearoa. Empowering the energy future …
Last updated: 21 Nov 2023
Service Measures Report 2023.pdf
… Service Measures Report 2023 November 2023 Service Measures Report 2023 Transpower New Zealand Limited 1 Contents Introduction 4 1.1. Purpose of service … as outlined in our analysis of electrification pathways Whakamana i Te Mauri Hiko.17 For our revenue linked grid …
Service Measures Report 2023.pdf
(PDF 3 MB)
Last updated: 21 Nov 2023
Asset Management Plan 2023.pdf
… ex Asset Management Plan 2023 Managing and maintaining our grid, ICT, and business support … 2023 Asset Management Plan 2023 Transpower New Zealand Limited 1 Contents Introduction… … and lower carbon sources of generation. Our purpose, Whakamana i te mauri hiko tu mai Aotearoa – empowering the …
Asset Management Plan 2023.pdf
(PDF 14.5 MB)
Last updated: 05 Dec 2022
Net Zero Grid Pathways 1 major capex proposal.pdf
… TRANSPOWER NEW ZEALAND | NET ZERO GRID PATHWAYS 1 – MAJOR CAPEX PROJECT (STAGED) INVESTIGATION 1 … 1 – MAJOR CAPEX PROJECT (STAGED) INVESTIGATION 2 Contents 1.0 Executive Summary … emissions by 2050. Industry forecasts, including our own Whakamana i Te Mauri Hiko (WiTMH), point toward a 60- 80 per …
Net Zero Grid Pathways 1 major capex proposal.pdf
(PDF 1.62 MB)
Last updated: 23 Sep 2021
SO Annual Review 2020-21.pdf
… System Operator Annual Self-Review and Assessment 2020-2021 … need to deliver the electrified future described in our Whakamana i te Mauri Hiko report. ▪ Working with the …
SO Annual Review 2020-21.pdf
(PDF 1.94 MB)
Last updated: 28 Feb 2023
Transpower interim report FY23
… Interim Report 2022/23 D .17 FINANCIAL STATEMENTS Six months … Zealand’s energy future, as laid out in our key document Whakamana i Te Mauri Hiko. Dr Keith Turner Chair Alison Andrew Chief …
Transpower_Interim Report 22-23.pdf
(PDF 505.4 KB)
Last updated: 30 Jun 2022
NZGP1 Shortlist Version For Publication.pdf
… TRANSPOWER NEW ZEALAND | NET ZERO GRID PATHWAYS 1 – MAJOR CAPEX PROJECT (STAGED) INVESTIGATION 1 … Project (Staged) Investigation Shortlist consultation Date: 30 June 2022 TRANSPOWER NEW ZEALAND | NET ZERO GRID … is not yet clear. Regardless, forecasts including our own Whakamana I Te Mauri Hiko (WiTMH)2 all point to a 60-80% …
NZGP1 Shortlist Version For Publication.pdf
(PDF 2.43 MB)