Search
Displaying 11 - 20 of 21
Last updated: 08 Dec 2022
SP-SD-001_Business_Performance_Charter.pdf
… Zealand Limited System Operations Division System Operator Policy Business Performance Charter Document Status: … to meet the Principle Performance Obligations (PPO). Our compliance with this charter is on a good faith basis and … Business Performance Charter Document Type: System Operator Policy SharePoint Version: 3.0 Document Status: Approved …
SP-SD-001_Business_Performance_Charter.pdf
(PDF 294.54 KB)
Last updated: 15 Apr 2025
GL-SD-1202 Guideline for submitting controllable load difference bids
… ................ 6 2.5 Providing data on distributor compliance with instruction to reduce or disconnect demand … controllable load via difference bids on WITS. External Policy/ Rules & Regulations List relevant ‘Code’ Parts … verbally in real time. 2.5 Providing data on distributor compliance with instruction to reduce or disconnect demand …
Last updated: 09 Aug 2023
GL-EA-1052 Interim Operational Guideline for Connecting DD and DNL Products to the Electricity Market.pdf
… to Dispatchable Demand, but it requires a lower level of compliance, so it is intended to allow smaller load stations … beneficial to join as a Dispatch Demand participant. Lower compliance is the absence of requirement to provide SCADA … they are unable to comply with. The trade-off for the lower compliance is that DNL station are not eligible for …
Last updated: 30 Sep 2024
Customer-led New Connections draft guideline V1.1
… to be supported by stakeholders, and aligns with national policy statements M – This project aligns with national policy statements L - This project is likely to be opposed … confirm harmonic disturbance will not present a risk of non-compliance once commissioned • grid voltage impact • …
Customer-led New Connections guideline
(PDF 681.28 KB)
Last updated: 12 Sep 2023
PR-OC-229 Update Registers, Email Notifications, Email CANs, Update Transpower Website.pdf
… for significant or permanent constraint changes. External Policy/ Rules & Regulations The ‘Code’ The ‘Code’ requires … Grid Owner Offers (CTO, PTP, AFS) SP-OC-759 Outage planning policy Outage Request Initial Assessment No Is it a … for permanent constraint notification to ensure we meet compliance requirements 5.1 2.0 6/6/14 Links to email …
Last updated: 07 Aug 2023
Typical property requirements and timeframes for a new GIP substation (August 2023)
… Building Act 2004, then the Lessee must pay all associated compliance costs. 6.2 Suitability of Land and Improvements: … The Lessor does not warrant or represent that: (a) compliance: the Lessee’s use of the Land and Improvements … by the Lessee at any time. 11 STATUTORY REQUIREMENTS 11.1 Compliance: At all times when acting under, or in relation …
Last updated: 17 Oct 2023
UG-SD-1071 SO Register Asset Owner User Guide.pdf
… is used by the System Operator to assess the non-compliance of the Asset Owner and their assets with its AOPOs and any effect that this non-compliance may have on the System Operator planning to … the Electricity Industry Participation Codes (the Code). Policy Statement The policies by which the System Operator …
UG-SD-1071 SO Register Asset Owner User Guide.pdf
(PDF 3.28 MB)
Last updated: 09 Nov 2023
GL-EA-766 Distribution Asset Test Requirements.pdf
… Plan Position Prepared By: Kevin Wronski, Principal Compliance Engineer, Rommel.Reyes Reviewed By: Louis … and validation of models, and by the system operator for compliance assessments, ancillary services performance … Details of any potential impacts to equipment capability or compliance with the Code expected during testing, ▪ …
GL-EA-766 Distribution Asset Test Requirements.pdf
(PDF 957.71 KB)
Last updated: 15 May 2023
GL-EA-765 Grid Asset Test Requirements.pdf
… Name & Position Prepared By: Kevin Wronski, Principal Compliance Engineer Reviewed By: Louis Southin, Engineering … and validation of models, and by the system operator for compliance assessments, ancillary services performance … Details of any potential impacts to equipment capability or compliance with the Code expected during testing; and, ▪ …
GL-EA-765 Grid Asset Test Requirements.pdf
(PDF 1.07 MB)
Last updated: 30 Jan 2025
GL-EA-010 Generator Testing Requirements.pdf
… and validation of models, and by the system operator for compliance assessments, ancillary services performance … date a final Commissioning Plan shall be shared with compliance@transpower.co.nz (unless advised otherwise) and … be made available for review by the system operator at compliance@transpower.co.nz (unless advised otherwise): ▪ …
GL-EA-010 Generator Testing Requirements.pdf
(PDF 1.79 MB)