Search
Displaying 411 - 420 of 511
Last updated: 12 Sep 2022
RMT_Specification_V9_issue.pdf
… dispatch (Five minute reserve modelling) Generator compliance monitoring and associated cost allocation … Contingent Event (ECE) are Risk Event types used in the Policy Statement to categorise and manage levels of risk. … are applicable. Within RMT any dispensation granted for non-compliance of a generator with Clause 8.19 is modelled and …
RMT_Specification_V9_issue.pdf
(PDF 1.33 MB)
Last updated: 12 Sep 2022
RMT_Specification_V9_issue.pdf
… dispatch (Five minute reserve modelling) Generator compliance monitoring and associated cost allocation … Contingent Event (ECE) are Risk Event types used in the Policy Statement to categorise and manage levels of risk. … are applicable. Within RMT any dispensation granted for non-compliance of a generator with Clause 8.19 is modelled and …
RMT_Specification_V9_issue.pdf
(PDF 1.33 MB)
Last updated: 08 Nov 2024
design-features-for-grid-support-contracts.pdf
… – The nature of GSCs extended reserves commitments, so Code compliance will prevent them offering load for a GSC when it … loads are being offered for GSC services, to facilitate compliance with their extended reserves obligations. For … being those defined as contingent events in the policy statement8. There are other possible contingencies …
design-features-for-grid-support-contracts.pdf
(PDF 685.99 KB)
Last updated: 21 Jul 2023
Transpower Integrated Report FY22
… and continue to support the regulatory, legislative and policy agenda that is moving Aotearoa New Zealand toward a … is a key stakeholder, as are local authorities which manage compliance of our assets and our work with the Resource … Approximately 88% of the courses delivered last year were compliance based; the remaining 12% were focused on …
Transpower_Integrated Report FY22.pdf
(PDF 19.87 MB)
Last updated: 30 Jan 2025
GL-EA-010 Generator Testing Requirements.pdf
… and validation of models, and by the system operator for compliance assessments, ancillary services performance … date a final Commissioning Plan shall be shared with compliance@transpower.co.nz (unless advised otherwise) and … be made available for review by the system operator at compliance@transpower.co.nz (unless advised otherwise): ▪ …
GL-EA-010 Generator Testing Requirements.pdf
(PDF 1.79 MB)
Last updated: 19 Nov 2020
TPM Options Consultation - PART B. Benefit-based charge.pdf
… is critical to a new TPM consistent with the Authority’s policy intent that is durable into the future. Part C of … • Life extension: extending the life of existing assets • Compliance: investment to comply with legal requirements … being made. 236. Investments due to asset replacement and compliance requirements are similar because the existing …
Last updated: 16 Nov 2022
Part A Consultation paper CULWP BBI consultation V2 27May.pdf
… in section 9.0 below • Part D: Legal assurance on the compliance of the consultation package with the draft … parties have questioned the merits of the new TPM from a policy perspective, and that some parties have questioned … of the consultation package. Chapman Tripp assessed legal compliance of the CUWLP documentation to be published for …
Last updated: 17 May 2022
Part A - Consultation paper - CULWP BBI consultation.pdf
… in section 9.0 below • Part D: Legal assurance on the compliance of the consultation package with the draft … parties have questioned the merits of the new TPM from a policy perspective, and that some parties have questioned … of the consultation package. Chapman Tripp assessed legal compliance of the CUWLP documentation to be published for …
Part A - Consultation paper - CULWP BBI consultation.pdf
(PDF 1.18 MB)
Last updated: 05 Dec 2022
NZGP1 MCP ATTACHMENT E - COSTING REPORT.pdf
… (STAGED) INVESTIGATION 4 Investment Proposal Attachment A – Compliance Requirements Attachment B – Power Systems …
NZGP1 MCP ATTACHMENT E - COSTING REPORT.pdf
(PDF 692.11 KB)
Last updated: 21 Oct 2019
TPR0003 Annual Review 2018-19 v11 Interactive 6.pdf
… planning and productivity. Delivering on our zero-harm policy An ongoing focus for the Board and the organisation … risks and driving safety performance. We have developed our policy and frameworks to provide greater clarity on the … seven other environmental approvals (e.g. certificates of compliance, bore permits). During F Y19 Transpower has had …
TPR0003 Annual Review 2018-19 v11 Interactive 6.pdf
(PDF 14.86 MB)