Last updated: 13 Feb 2025
Black start
Black start is the first step in the process of system restoration in the unlikely event of an island-wide black-out.
Last updated: 13 Feb 2025
Black start is the first step in the process of system restoration in the unlikely event of an island-wide black-out.
Last updated: 12 Dec 2023
Last updated: 13 Feb 2025
Over-frequency reserve is provided by generating units that can be armed when required and automatically disconnected from the power system due to a sudden rise in system frequency.
Last updated: 13 Feb 2025
Instantaneous reserve is generating capacity, or interruptible load, available to operate automatically in the event of a sudden failure of a large generating plant or the HVDC link.
Last updated: 13 Feb 2025
Frequency keeping services are required to manage short term supply and demand imbalances to ensure that the system frequency is maintained at or near 50 Hz.
Last updated: 15 Apr 2025
Last updated: 25 Sep 2024
We procure ancillary services to support the reliable operation of the power system and assist us to meet our Principal Performance Obligations
Last updated: 12 Sep 2022
Last updated: 26 Mar 2025
The Policy Statement set out how the System Operator will meet its code obligations
Last updated: 13 Sep 2022