Waikanae Park Tree Removal and Vegetation Replanting
Last updated: 04 Mar 2025
We're working with Kapiti Coast District Council on the removal of trees threatening two transmission lines that run through Waikanae Park.
Last updated: 04 Mar 2025
We're working with Kapiti Coast District Council on the removal of trees threatening two transmission lines that run through Waikanae Park.
Last updated: 04 Mar 2025
Investigating the capacity of the 220 kV grid between Whakamaru and Wairakei known as the Wairakei Ring.
Last updated: 04 Mar 2025
Building a connection point to Contact Energy's new Tauhara geothermal generation station.
Last updated: 28 Feb 2025
Transpower is working to improve the resilience of the Hawke’s Bay’s electricity supply by strengthening our Redclyffe substation. The substation was severely damaged during Cyclone Gabrielle in 2023.
Last updated: 28 Feb 2025
We're making investments to manage voltage stability in the Waikato and Upper North Island regions.
Last updated: 27 Feb 2025
Information about our work to upgrade the Cromwell to Frankton line and the transformers at Frankton substation.
Last updated: 27 Feb 2025
Transpower is commencing work to identify the need for investment on the southern Waikato 110 kV network.
Last updated: 27 Feb 2025
Transpower is undertaking work to release more capacity in its network between Edgecumbe and Kawerau.
Last updated: 27 Feb 2025
Huapai has an existing switching station which will need to develop into a substation to provide Northland more resilience and be available for demand growth in North Auckland.