Our proposal to the Commerce Commission for how we will operate, maintain and invest in the grid from 1 July 2020 - 30 June 2025 is available to read.
Our proposal has been submitted to the Commerce Commission and includes our proposed cost forecasts and performance targets. The RCP3 proposal submission to the Commerce Commission includes the documents listed below.
Main Proposal
- Securing our Energy Future - RCP3 proposal
- RCP3 Cover Letter
- Asset Management Plan 2018
- Transmission Planning Report 2018
- Grid Outputs Report 2018
- Asset Health Framework 2018
- Asset Criticality Framework 2018
- Integrated Transmission Plan Compliance Report
- Integrated Transmission Plan Glossary 2018
- Independent Verification Report
- Deed relating to RCP3 Independent Verification
Regulatory Templates and Revenue Model
- RT01 Expenditure Forecasts
- RT02 Output Incentives Model
- RT03 Cost Escalation Model
- RT04 Information Schedules
- Revenue Model
Associated documents
ICT Requirements and Strategy​