Pre-workshop material
Here is the pre-workshop material for the TCC workshops, held on 6 October 2020 as part of the TPM Development Project.
Link | Content |
---|---|
A video from the Electricity Authority | Director Transmission Pricing Rob Bernau explains the EA's option for a TCC. |
TCC information and context [ pdf 1.06 MB ] | Information and context about a possible TCC, addressing relevant considerations about the need for a TCC, an overview of System Operator tools for managing supply and demand (including after the implementation of Real-Time Pricing), and some practical design considerations. Also includes an outline for the workshops and questions for discussion. |
Excerpts from EA TPM documents [ pdf 553.98 KB ] | Published information about a possible TCC, taken from the EA's June 2020 TPM Decision Paper and its March 2020 paper on Peak charges under proposed TPM Guidelines. |
2018 Grid Owner case studies relating to RCPD removal [ pdf 147.84 KB ] | A relevant excerpt from our 2018 document The role of peak pricing for transmission that examines RCPD removal and the effect on investment. The full document is available here. |